Goto Section: 73.58 | 73.62 | Table of Contents
FCC 73.61
Revised as of October 1, 2020
Goto Year:2019 |
2021
§ 73.61 AM directional antenna field strength measurements.
(a) Each AM station using a directional antenna with monitoring point
locations specified in the instrument of authorization must make field
strength measurements as often as necessary to ensure that the field at
each of those points does not exceed the value specified in the station
authorization. Additionally, stations not having an approved sampling
system must make the measurements once each calendar quarter at
intervals not exceeding 120 days. The provision of this paragraph
supersedes any schedule specified on a station license issued prior to
January 1, 1986. The results of the measurements are to be entered into
the station log pursuant to the provisions of § 73.1820.
(b) If the AM license was granted on the basis of field strength
measurements performed pursuant to § 73.151(a), partial proof of
performance measurements using the procedures described in § 73.154 must
be made whenever the licensee has reason to believe that the radiated
field may be exceeding the limits for which the station was most
recently authorized to operate.
(c) A station may be directed to make a partial proof of performance by
the FCC whenever there is an indication that the antenna is not
operating as authorized.
[ 50 FR 47054 , Nov. 14, 1985, as amended at 73 FR 64560 , Oct. 30, 2008]
Goto Section: 73.58 | 73.62
Goto Year: 2019 |
2021
CiteFind - See documents on FCC website that
cite this rule
Want to support this service?
Thanks!
Report errors in
this rule. Since these rules are converted to HTML by machine, it's possible errors have been made. Please
help us improve these rules by clicking the Report FCC Rule Errors link to report an error.
hallikainen.com
Helping make public information public