Goto Section: 25.160 | 25.162 | Table of Contents
FCC 25.161
Revised as of October 1, 2020
Goto Year:2019 |
2021
§ 25.161 Automatic termination of station authorization.
A station authorization shall be automatically terminated in whole or
in part without further notice to the licensee upon:
(a)(1) The failure to meet an applicable milestone specified in
§ 25.164(a) or (b), if no authorized space station is functional in
orbit;
(2) The failure to meet an applicable milestone specified in
§ 25.164(b)(1) or (2), if at least one authorized space station is
functional in an authorized orbit, which failure will result in the
termination of authority for the space stations not in orbit as of the
milestone date, but allow for technically identical replacements; or
(3) The failure to meet any other milestone or construction requirement
imposed as a condition of authorization. In the case of a space station
authorization when at least one authorized space station is functional
in orbit, however, such termination will be with respect to only the
authorization for any space stations not in orbit as of the milestone
date.
(b) The expiration of the license term, unless, in the case of an earth
station license, an application for renewal of the license has been
filed with the Commission pursuant to § 25.121(e) or, in the case of a
space station license, an application for extension of the license term
has been filed with the Commission; or
(c) The removal or modification of the facilities which renders the
station not operational for more than 90 days, unless specific
authority is requested.
(d) The failure to maintain 50 percent of the maximum number of NGSO
space stations authorized for service following the 9-year milestone
period as functional space stations in authorized orbits, which failure
will result in the termination of authority for the space stations not
in orbit as of the date of noncompliance, but allow for technically
identical replacements.
[ 56 FR 24016 , May 28, 1991, as amended at 68 FR 51507 , Aug. 27, 2003;
78 FR 8425 , Feb. 6, 2013; 79 FR 8320 , Feb. 12, 2014; 82 FR 59985 , Dec.
18, 2017]
Goto Section: 25.160 | 25.162
Goto Year: 2019 |
2021
CiteFind - See documents on FCC website that
cite this rule
Want to support this service?
Thanks!
Report errors in
this rule. Since these rules are converted to HTML by machine, it's possible errors have been made. Please
help us improve these rules by clicking the Report FCC Rule Errors link to report an error.
hallikainen.com
Helping make public information public