Goto Section: 25.148 | 25.150 | Table of Contents
FCC 25.149
Revised as of October 5, 2017
Goto Year:2016 |
2018
§ 25.149 Application requirements for ancillary terrestrial components in
Mobile-Satellite Service networks operating in the 1.5./1.6 GHz and 1.6/2.4
GHz Mobile-Satellite Service.
(a) Applicants for ancillary terrestrial component authority shall
demonstrate that the applicant does or will comply with the following
through certification or explanatory technical exhibit, as appropriate:
(1) ATC shall be deployed in the forward-band mode of operation whereby
the ATC mobile terminals transmit in the MSS uplink bands and the ATC
base stations transmit in the MSS downlink bands in portions of the
1626.5-1660.5 MHz/1525-1559 MHz bands (L-band) and the 1610-1626.5
MHz/2483.5-2500 MHz bands.
Note to paragraph (a)(1): An L-band MSS licensee is permitted to apply
for ATC authorization based on a non-forward-band mode of operation
provided it is able to demonstrate that the use of a non-forward-band
mode of operation would produce no greater potential interference than
that produced as a result of implementing the rules of this section. A
1.6/2.4 GHz band licensee is permitted to apply for ATC authorization
on a non-forward-band mode of operation where the equipment deployed
will meet the requirements of paragraph (c)(4) of this section.
(2) ATC operations shall be limited to certain frequencies:
(i) [Resreved]
(ii) In the 1626.5-1660.5 MHz/1525-1559 MHz bands (L-band), ATC
operations are limited to the frequency assignments authorized and
internationally coordinated for the MSS system of the MSS licensee that
seeks ATC authority.
(iii) In the 1610-1626.5 MHz/2483.5-2500 MHz bands, ATC operations are
limited to the 1610-1617.775 MHz, 1621.35-1626.5 MHz, and 2483.5-2495
MHz bands and to the specific frequencies authorized for use by the MSS
licensee that seeks ATC authority.
(3) ATC operations shall not exceed the geographical coverage area of
the Mobile-Satellite Service network of the applicant for ATC
authority.
(4) ATC base stations shall comply with all applicable antenna and
structural clearance requirements established in part 17 of this
chapter.
(5) ATC base stations and mobile terminals shall comply with part 1 of
this chapter, Subpart I—Procedures Implementing the National
Environmental Policy Act of 1969, including the guidelines for human
exposure to radio frequency electromagnetic fields as defined in
§ § 1.1307(b) and 1.1310 of this chapter for PCS networks.
(6) ATC base station operations shall use less than all available MSS
frequencies when using all available frequencies for ATC base station
operations would exclude otherwise available signals from MSS
space-stations.
(b) Applicants for an ancillary terrestrial component shall demonstrate
that the applicant does or will comply with the following criteria
through certification:
(1) Geographic and temporal coverage. (i) [Reserved]
(ii) For the L-band, an applicant must demonstrate that it can provide
space-segment service covering all 50 states, Puerto Rico, and the U.S.
Virgin Islands one-hundred percent of the time, unless it is not
technically possible for the MSS operator to meet the coverage criteria
from its orbital position.
(iii) For the 1.6/2.4 GHz Mobile-Satellite Service bands, an applicant
must demonstrate that it can provide space-segment service to all
locations as far north as 70° North latitude and as far south as 55°
South latitude for at least seventy-five percent of every 24-hour
period, i.e., that at least one satellite will be visible above the
horizon at an elevation angle of at least 5° for at least 18 hours each
day, and on a continuous basis throughout the fifty states, Puerto Rico
and the U.S. Virgin Islands, i.e., that at least one satellite will be
visible above the horizon at an elevation angle of at least 5° at all
times.
(2) Replacement satellites. (i) Operational NGSO MSS ATC systems shall
maintain an in-orbit spare satellite.
(ii) Operational GSO MSS ATC systems shall maintain a spare satellite
on the ground within one year of commencing operations and launch it
into orbit during the next commercially reasonable launch window
following a satellite failure.
(iii) All MSS ATC licensees must report any satellite failures,
malfunctions or outages that may require satellite replacement within
ten days of their occurrence.
(3) Commercial availability. Mobile-satellite service must be
commercially available (viz., offering services for a fee) in
accordance with the coverage requirements that pertain to each band as
a prerequisite to an MSS licensee's offering ATC service.
(4) Integrated services. MSS ATC licensees shall offer an integrated
service of MSS and MSS ATC. Applicants for MSS ATC may establish an
integrated service offering by affirmatively demonstrating that:
(i) The MSS ATC operator will use a dual-mode handset that can
communicate with both the MSS network and the MSS ATC component to
provide the proposed ATC service; or
(ii) Other evidence establishing that the MSS ATC operator will provide
an integrated service offering to the public.
(5) In-band operation. (i) [Reserved]
(ii) In the 1.6/2.4 GHz Mobile-Satellite Service bands, MSS ATC is
limited to no more than 7.775 MHz of spectrum in the L-band and 11.5
MHz of spectrum in the S-band. Licensees in these bands may implement
ATC only on those channels on which MSS is authorized, consistent with
the 1.6/2.4 GHz Mobile-Satellite Service band-sharing arrangement.
(iii) In the L-band, MSS ATC is limited to those frequency assignments
available for MSS use in accordance with the Mexico City Memorandum of
Understanding, its successor agreements or the result of other
organized efforts of international coordination.
(c) Equipment certification. (1) Each ATC mobile station utilized for
operation under this part and each transmitter marketed, as set forth
in § 2.803 of this chapter, must be of a type that has been authorized
by the Commission under its certification procedure for use under this
part.
(2) Any manufacturer of radio transmitting equipment to be used in
these services may request equipment authorization following the
procedures set forth in subpart J of part 2 of this chapter. Equipment
authorization for an individual transmitter may be requested by an
applicant for a station authorization by following the procedures set
forth in part 2 of this chapter.
(3) Licensees and manufacturers are subject to the radiofrequency
radiation exposure requirements specified in § § 1.1307(b), 2.1091, and
2.1093 of this chapter, as appropriate. ATC base stations must comply
with the requirements specified in § 1.1307(b) of this chapter for PCS
base stations. ATC mobile stations must comply with the requirements
specified for mobile and portable PCS transmitting devices in
§ 1.1307(b) of this chapter. ATC mobile terminals must also comply with
the requirements in § § 2.1091 and 2.1093 of this chapter for Satellite
Communications Services devices. Applications for equipment
authorization of ATC mobile or portable devices operating under this
section must contain a statement confirming compliance with these
requirements for both fundamental emissions and unwanted emissions.
Technical information showing the basis for this statement must be
submitted to the Commission upon request.
(4) Applications for equipment authorization of terrestrial low-power
system equipment that will operate in the 2483.5-2495 MHz band shall
demonstrate the following:
(i) The transmitted signal is digitally modulated;
(ii) The 6 dB bandwidth is at least 500 kHz;
(iii) The maximum transmit power is no more than 1 W with a peak EIRP
of no more than 6 dBW;
(iv) The maximum power spectral density conducted to the antenna is not
greater than 8 dBm in any 3 kHz band during any time interval of
continuous transmission;
(v) Emissions below 2483.5 MHz are attenuated below the transmitter
power (P) measured in watts by a factor of at least 40 + 10 log (P) dB
at the channel edge at 2483.5 MHz, 43 + 10 log (P) dB at 5 MHz from the
channel edge, and 55 + 10 log (P) dB at X MHz from the channel edge
where X is the greater of 6 MHz or the actual emission bandwidth.
(vi) Emissions above 2495 MHz are attenuated below the transmitter
power (P) measured in watts by a factor of at least 43 + 10 log (P) dB
on all frequencies between the channel edge at 2495 MHz and X MHz from
this channel edge and 55 + 10 log (P) dB on all frequencies more than X
MHz from this channel edge, where X is the greater of 6 MHz or the
actual emission bandwidth;
(vii) Compliance with these rules is based on the use of measurement
instrumentation employing a resolution bandwidth of 1 MHz or greater.
However, in the 1 MHz bands immediately above and adjacent to the 2495
MHz a resolution bandwidth of at least 1 percent of the emission
bandwidth of the fundamental emission of the transmitter may be
employed. If 1 percent of the emission bandwidth of the fundamental
emission is less than 1 MHz, the power measured must be integrated over
the required measurement bandwidth of 1 MHz. A resolution bandwidth
narrower than 1 MHz is permitted to improve measurement accuracy,
provided the measured power is integrated over the full required
measurement bandwidth (i.e., 1 MHz). The emission bandwidth of the
fundamental emission of a transmitter is defined as the width of the
signal between two points, one below the carrier center frequency and
one above the carrier center frequency, outside of which all emissions
are attenuated at least 26 dB below the transmitter power. When an
emission outside of the authorized bandwidth causes harmful
interference, the Commission may, at its discretion, require greater
attenuation than specified in this section; and
Note to paragraph (c)(4): Systems meeting the requirements set forth in
this section are deemed to have also met the requirements of § 25.254(a)
through (d). No further demonstration is needed for these systems with
respect to § 25.254(a)-(d).
(d) Applicants for an ancillary terrestrial component authority shall
demonstrate that the applicant does or will comply with the provisions
of § 1.924 of this chapter and § § 25.203(e) through 25.203(g) and with
§ 25.253 or § 25.254, as appropriate, through certification or
explanatory technical exhibit.
(e) Except as provided for in paragraphs (f) and (g) of this section,
no application for an ancillary terrestrial component shall be granted
until the applicant has demonstrated actual compliance with the
provisions of paragraph (b) of this section. Upon receipt of ATC
authority, all ATC licensees shall ensure continued compliance with
this section and § 25.253 or § 25.254, as appropriate.
(f) Special provision for operational MSS systems. Applicants for MSS
ATC authority with operational MSS systems that are in actual
compliance with the requirements prescribed in paragraphs (b)(1),
(b)(2), and (b)(3) of this section at the time of application may elect
to satisfy the requirements of paragraphs (b)(4) and (b)(5) of this
section prospectively by providing a substantial showing in its
certification regarding how the applicant will comply with the
requirements of paragraphs (b)(4) and (b)(5) of this section.
Notwithstanding § 25.117(f) and paragraph (e) of this section, the
Commission may grant an application for ATC authority based on such a
prospective substantial showing if the Commission finds that operations
consistent with the substantial showing will result in actual
compliance with the requirements prescribed in paragraphs (b)(4) and
(b)(5) of this section. An MSS ATC applicant that receives a grant of
ATC authority pursuant to this paragraph (f) shall notify the
Commission within 30 days once it begins providing ATC service. This
notification must take the form of a letter formally filed with the
Commission in the appropriate MSS license docket and shall contain a
certification that the MSS ATC service is consistent with its ATC
authority.
(g) Special provisions for terrestrial low-power systems in the
2483.5-2495 MHz band. (1) An operational MSS system that applies for
authority to deploy ATC in the 2483.5-2495 MHz band for terrestrial
low-power operations satisfying the equipment certification
requirements of paragraph (c)(4) of this section is not required to
demonstrate compliance with paragraph (b) of this section, except to
demonstrate the commercial availability of MSS, without regard to
coverage requirements.
(2) An ATC licensee seeking to modify its license to add authority to
operate a terrestrial low-power network shall certify in its
modification application that its operations will utilize a Network
Operating System (NOS), consisting of a network management system
located at an operations center or centers. The NOS shall have the
technical capability to address and resolve interference issues related
to the licensee's network operations by reducing operational power;
adjusting operational frequencies; shutting off operations; or any
other appropriate means. The NOS shall also have the ability to resolve
interference from the terrestrial low-power network to the licensee's
MSS operations and to authorize access points to the network, which in
turn may authorize access to the network by end-user devices. The NOS
operations center shall have a point of contact in the United States
available 24 hours a day, seven days a week, with a phone number and
address made publicly-available by the licensee.
(3) All access points operating in the 2483.5-2495 MHz band shall only
operate when authorized by the ATC licensee's NOS, and all client
devices operating in the 2483.5-2495 MHz band shall only operate when
under the control of such access points.
(h) Spectrum leasing. Leasing of spectrum rights by MSS licensees or
system operators to spectrum lessees for ATC use is subject to the
rules for spectrum manager leasing arrangements (see § 1.9020) as set
forth in part 1, subpart X of the rules (see § 1.9001 et seq.). In
addition, at the time of the filing of the requisite notification of a
spectrum manager leasing arrangement using Form 608 (see § § 1.9020(e)
and 1.913(a)(5)), both parties to the proposed arrangement must have a
complete and accurate Form 602 (see § 1.913(a)(2)) on file with the
Commission.
[ 68 FR 47859 , Aug. 12, 2003, as amended at 69 FR 48162 , Aug. 9, 2004;
70 FR 19318 , Apr. 13, 2005, 73 FR 25592 , May 7, 2008; 76 FR 31260 , May
31, 2011; 78 FR 8267 , Feb. 5, 2013; 78 FR 8424 , Feb. 6, 2013; 79 FR 27502 , May 14, 2014; 82 FR 8818 , Jan. 31, 2017]
Effective Date Note: At 82 FR 8818 , Jan. 31, 2017, § 25.149 was amended
by revising paragraph (a)(1), the note to paragraph (a)(1), paragraph
(c)(3); adding paragraph (c)(4); revising paragraph (e); redesignating
paragraph (g) as paragraph (h); and adding new paragraph (g). This
amendment contains information collection and recordkeeping
requirements and will not become effective until approval has been
given by the Office of Management and Budget.
return arrow Back to Top
Processing of Applications
return arrow Back to Top
Goto Section: 25.148 | 25.150
Goto Year: 2016 |
2018
CiteFind - See documents on FCC website that
cite this rule
Want to support this service?
Thanks!
Report errors in
this rule. Since these rules are converted to HTML by machine, it's possible errors have been made. Please
help us improve these rules by clicking the Report FCC Rule Errors link to report an error.
hallikainen.com
Helping make public information public