Sec. 24.247 Triggering a reimbursement obligation.
(a) Licensed PCS . The clearinghouse will apply the following test to
determine if a PCS entity preparing to initiate operations must pay a PCS
relocator or a voluntarily relocating microwave incumbent in accordance with
the formula detailed in Sec. 24.243:
(1) All or part of the relocated microwave link was initially co-channel
with the licensed PCS band(s) of the subsequent PCS entity;
(2) A PCS relocator has paid the relocation costs of the microwave
incumbent; and
(3) The subsequent PCS entity is preparing to turn on a fixed base station
at commercial power and the fixed base station is located within a rectangle
(Proximity Threshold) described as follows:
(i) The length of the rectangle shall be x where x is a line extending
through both nodes of the microwave link to a distance of 48 kilometers (30
miles) beyond each node. The width of the rectangle shall be y where y is a
line perpendicular to x and extending for a distance of 24 kilometers (15
miles) on both sides of x. Thus, the rectangle is represented as follows:
[ec01mr91.041.gif]
View or download PDF
(ii) If the application of the Proximity Threshold test indicates that a
reimbursement obligation exists, the clearinghouse will calculate the
reimbursement amount in accordance with the cost-sharing formula and notify
the subsequent PCS entity of the total amount of its reimbursement
obligation.
(b) Unlicensed PCS . UTAM's reimbursement obligation is triggered either:
(1) When a county is cleared of microwave links in the unlicensed
allocation, and UTAM invokes a Zone 1 power cap as a result of third party
relocation activities; or
(2) A county is cleared of microwave links in the unlicensed allocation and
UTAM reclassifies a Zone 2 county to Zone 1 status.
(c) Any new entrants granted licenses for the 1910–1915 MHz band must
reimburse UTAM a pro rata share of its total expenses incurred by UTAM as of
the date that the new entrants gain access to the band. The percent required
by new entrants to pay shall be calculated based upon the amount of spectrum
granted to the new entrant as compared to the total amount of spectrum UTAM
is responsible for clearing of incumbents (20 megahertz), and must be paid
before a new entrant begins operations in the band. For example, if a new
entrant obtains a license for 5 megahertz of spectrum in this band, it is
required to reimburse UTAM one-quarter of UTAM's total costs to date on a
pro rata shared basis. New entrants will be responsible for the actual costs
associated with future relocation activities in their licensed spectrum, but
will be entitled to seek reimbursement from UTAM for the proportion of those
band clearing costs that benefit users of the 1915–1930 MHz band.
[ 61 FR 29692 , June 12, 1996, as amended at 62 FR 12757 , Mar. 18, 1997; 69 FR 67836 , Nov. 22, 2004]
Goto Section: 24.245 | 24.249
Goto Year: 2007 |
2009
CiteFind - See documents on FCC website that
cite this rule
Want to support this service?
Thanks!
Report errors in
this rule. Since these rules are converted to HTML by machine, it's possible errors have been made. Please
help us improve these rules by clicking the Report FCC Rule Errors link to report an error.
hallikainen.com
Helping make public information public