Goto Section: 90.355 | 90.359 | Table of Contents
FCC 90.357
Revised as of October 1, 2020
Goto Year:2019 |
2021
§ 90.357 Frequencies for LMS systems in the 902-928 MHz band.
(a) Multilateration LMS systems will be authorized on the following LMS
sub-bands:
LMS sub-band Forward link^1
904.000-909.750 MHz 927.750-928.000 MHz.
919.750-921.750 MHz.^2 927.500-927.750 MHz.
921.750-927.250 MHz 927.250-927.500 MHz.
^1Forward links for LMS systems may also be contained within the LMS
sub-band. However, the maximum allowable power in these sub-bands is 30
Watts ERP in accordance with § 90.205(l).
^2The frequency band 919.750-921.750 MHz is shared co-equally between
multilateration and non-multilateration LMS systems.
(b) Non-multilateriation LMS systems will be authorized in the
following frequency bands:
LMS Sub-band^1
902.000-904.000 MHz
909.750-921.750 MHz
^1Applicants for non-multilateration LMS systems should request only
the minimum amount of bandwidth necessary to meet their operational
needs.
[ 72 FR 35198 , June 27, 2007, as amended at 75 FR 19284 , Apr. 14, 2010]
Goto Section: 90.355 | 90.359
Goto Year: 2019 |
2021
CiteFind - See documents on FCC website that
cite this rule
Want to support this service?
Thanks!
Report errors in
this rule. Since these rules are converted to HTML by machine, it's possible errors have been made. Please
help us improve these rules by clicking the Report FCC Rule Errors link to report an error.
hallikainen.com
Helping make public information public