Goto Section: 25.121 | 25.123 | Table of Contents
FCC 25.122
Revised as of October 1, 2020
Goto Year:2019 |
2021
§ 25.122 Applications for streamlined small space station authorization.
Link to an amendment published at 85 FR 52452 , Aug. 25, 2020.
(a) This section shall only apply to applicants for NGSO systems that
are able to certify compliance with the certifications set forth in
paragraph (c) of this section. For applicants seeking to be authorized
under this section, a comprehensive proposal for Commission evaluation
must be submitted for each space station in the proposed system on FCC
Form 312, Main Form and Schedule S, as described in § 25.114(a) through
(c), together with the certifications described in paragraph (c) of
this section and the narrative requirements described in paragraph (d)
of this section.
(b) Applications for NGSO systems may be filed under this section,
provided that the total number of space stations requested in the
application is ten or fewer.
(1) To the extent that space stations in the satellite system will be
technically identical, the applicant may submit an application for
blanket-licensed space stations.
(2) Where the space stations in the satellite system are not
technically identical, the applicant must certify that each space
station satisfies the criteria in paragraph (c) of this section, and
submit technical information for each type of space station.
(c) Applicants filing for authorization under the streamlined procedure
described in this section must include with their applications
certifications that the following criteria will be met for all space
stations to be operated under the license:
(1) The space station(s) will operate only in non-geostationary orbit;
(2) The total in-orbit lifetime for any individual space station will
be six years or less;
(3) The space station(s):
(i) Will be deployed at an orbital altitude of 600 km or below; or
(ii) Will maintain a propulsion system and have the ability to make
collision avoidance and deorbit maneuvers using propulsion;
(4) Each space station will be identifiable by a unique signal-based
telemetry marker distinguishing it from other space stations or space
objects;
(5) The space station(s) will release no operational debris;
(6) The space station operator has assessed and limited the probability
of accidental explosions, including those resulting from the conversion
of energy sources on board the space station(s) into energy that
fragments the spacecraft;
(7) The probability of a collision between each space station and any
other large object (10 centimeters or larger) during the orbital
lifetime of the space station is 0.001 or less as calculated using
current National Aeronautics and Space Administration (NASA) software
or other higher fidelity model;
(8) The space station(s) will be disposed of post-mission through
atmospheric re-entry. The probability of human casualty from portions
of the spacecraft surviving re-entry and reaching the surface of the
Earth is zero as calculated using current NASA software or higher
fidelity models;
(9) Operation of the space station(s) will be compatible with existing
operations in the authorized frequency band(s). Operations will not
materially constrain future space station entrants from using the
authorized frequency band(s);
(10) The space station(s) can be commanded by command originating from
the ground to immediately cease transmissions and the licensee will
have the capability to eliminate harmful interference when required
under the terms of the license or other applicable regulations;
(11) Each space station is 10 cm or larger in its smallest dimension;
and
(12) Each space station will have a mass of 180 kg or less, including
any propellant.
(d) The following information in narrative form shall be contained in
each application:
(1) An overall description of system facilities, operations, and
services and an explanation of how uplink frequency bands would be
connected to downlink frequency bands;
(2) Public interest considerations in support of grant;
(3) A description of means by which requested spectrum could be shared
with both current and future operators, (e.g., how ephemeris data will
be shared, antenna design, earth station geographic locations) thereby
not materially constraining other operations in the requested frequency
band(s);
(4) For space stations with any means of maneuverability, including
both active and passive means, a description of the design and
operation of maneuverability and deorbit systems, and a description of
the anticipated evolution over time of the orbit of the proposed
satellite or satellites; and
(5) In any instances where spacecraft capable of having crew aboard
will be located at or below the deployment orbital altitude of the
space station seeking a license, a description of the design and
operational strategies that will be used to avoid in-orbit collision
with such crewed spacecraft shall be furnished at time of application.
This narrative requirement will not apply to space stations that will
operate beyond Earth's orbit.
(6) A list of the FCC file numbers or call signs for any known
applications or Commission grants related to the proposed operations
(e.g., experimental license grants, other space station or earth
station applications or grants).
[ 85 FR 43734 , July 20, 2020]
Goto Section: 25.121 | 25.123
Goto Year: 2019 |
2021
CiteFind - See documents on FCC website that
cite this rule
Want to support this service?
Thanks!
Report errors in
this rule. Since these rules are converted to HTML by machine, it's possible errors have been made. Please
help us improve these rules by clicking the Report FCC Rule Errors link to report an error.
hallikainen.com
Helping make public information public