Goto Section: 25.135 | 25.137 | Table of Contents
FCC 25.136
Revised as of October 5, 2017
Goto Year:2016 |
2018
§ 25.136 Earth Stations in the 27.5-28.35 GHz and 37.5-40 GHz bands.
(a) FSS is secondary to the Upper Microwave Flexible Use Service in the
27.5-28.35 GHz band. Notwithstanding that secondary status, an earth
station in the 27.5-28.35 GHz band that meets one of the criteria
listed below may operate consistent with the terms of its authorization
without providing any additional interference protection to stations in
the Upper Microwave Flexible Use Service:
(1) The FSS licensee also holds the relevant Upper Microwave Flexible
Use Service license(s) for the area in which the earth station
generates a power flux density (PFD), at 10 meters above ground level,
of greater than or equal to −77.6 dBm/m2/MHz;
(2) The FSS earth station was authorized prior to July 14, 2016; or
(3) The application for the FSS earth station was filed prior to July
14, 2016 and has been subsequently granted; or
(4) The applicant demonstrates compliance with all of the following
criteria in its application:
(i) There are no more than two other authorized earth stations
operating in the 27.5-28.35 GHz band within the county where the
proposed earth station is located that meet the criteria contained in
either paragraphs (a)(1), (2), (3), or (4) of this section. For
purposes of this requirement, multiple earth stations that are
collocated with or at a location contiguous to each other shall be
considered as one earth station;
(ii) The area in which the earth station generates a power flux density
(PFD), at 10 meters above ground level, of greater than or equal to
−77.6 dBm/m2/MHz, together with the similar area of any other earth
station authorized pursuant to paragraph (a) of this section, does not
cover, in the aggregate, more than 0.1 percent of the population of the
county within which the earth station is located;
(iii) The area in which the earth station generates a power flux
density (PFD), at 10 meters above ground level, of greater than or
equal to −77.6 dBm/m2/MHz does not contain any major event venue,
arterial street, interstate or U.S. highway, urban mass transit route,
passenger railroad, or cruise ship port; and
(iv) The applicant has successfully completed frequency coordination
with the UMFUS licensees within the area in which the earth station
generates a power flux density (PFD), at 10 meters above ground level,
of greater than or equal to −77.6 dBm/m2/MHz with respect to existing
facilities constructed and in operation by the UMFUS licensee. In
coordinating with UMFUS licensees, the applicant shall use the
applicable processes contained in § 101.103(d) of this chapter.
(b) Applications for earth stations in the 37.5-40 GHz band shall
provide an exhibit describing the zone within which the earth station
will require protection from transmissions of Upper Microwave Flexible
Use Service licensees. For purposes of this rule, the protection zone
shall consist of the area where UMFUS licensees may not locate
facilities without the consent of the earth station licensee. The earth
station applicant shall demonstrate in its application, using
reasonable engineering methods, that the requested protection zone is
necessary in order to protect its proposed earth station.
(c) The protection zone (as defined in paragraph (b) of this section)
shall comply with the following criteria. The applicant shall
demonstrate compliance with all of the following criteria in its
application:
(1) There are no more than two other authorized earth stations
operating in the 37.5-40 GHz band within the Partial Economic Area
within which the proposed earth station is located that meet the
criteria contained in paragraph (c) of this section. For purposes of
this requirement, multiple earth stations that are collocated with or
at a location contiguous to each other shall be considered as one earth
station;
(2) The protection zone, together with the protection zone of other
earth stations in the same Partial Economic Area authorized pursuant to
this section, does not cover, in the aggregate, more than 0.1 percent
of the population of the Partial Economic Area within which the earth
station is located;
(3) The protection zone does not contain any major event venue,
arterial street, interstate or U.S. highway, urban mass transit route,
passenger railroad, or cruise ship port; and
(4) The applicant has successfully completed frequency coordination
with the UMFUS licensees within the protection zone with respect to
existing facilities constructed and in operation by the UMFUS licensee.
In coordinating with UMFUS licensees, the applicant shall use the
applicable processes contained in § 101.103(d) of this chapter.
(d) If an earth station applicant or licensee in the 27.5-28.35 GHz or
37. 5-40 GHz bands enters into an agreement with an UMFUS licensee,
their operations shall be governed by that agreement, except to the
extent that the agreement is inconsistent with the Commission's rules
or the Communications Act.
[ 81 FR 79937 , Nov. 14, 2016]
return arrow Back to Top
Goto Section: 25.135 | 25.137
Goto Year: 2016 |
2018
CiteFind - See documents on FCC website that
cite this rule
Want to support this service?
Thanks!
Report errors in
this rule. Since these rules are converted to HTML by machine, it's possible errors have been made. Please
help us improve these rules by clicking the Report FCC Rule Errors link to report an error.
hallikainen.com
Helping make public information public