Goto Section: 78.51 | 78.55 | Table of Contents
FCC 78.53
Revised as of October 1, 2010
Goto Year:2009 |
2011
§ 78.53 Unattended operation.
(a) A CARS station may be operated unattended: Provided, That such
operation is conducted in accordance with the conditions listed below:
And provided further, That the Commission, in Washington, DC, is
notified at least 10 days prior to the beginning of unattended
operation if such operation is not indicated on the station
authorization.
(1) The transmitter and associated control circuits shall be installed
and protected in a manner designed to prevent tampering or operation by
unauthorized persons.
(2) If the transmitting apparatus is located at a site which is not
readily accessible at all hours and in all seasons, means shall be
provided for turning the transmitter on and off at will from a location
which can be reached promptly at all hours and in all seasons.
(3) Personnel responsible for the maintenance of the station shall be
available on call at a location which will assure expeditious
performance of such technical servicing and maintenance as may be
necessary whenever the station is operating. In lieu thereof,
arrangements may be made to have a person or persons available at all
times when the transmitter is operating, to turn the transmitter off in
the event that it is operating improperly. The transmitter may not be
restored to operation until the malfunction has been corrected by a
technically qualified person.
(4) The station licensee shall be responsible for the proper operation
of the station at all times and is expected to provide for
observations, servicing and maintenance as often as may be necessary to
ensure proper operation. All adjustments or tests during or coincident
with the installation, servicing, or maintenance of the station which
may affect its operation shall be performed by or under the immediate
supervision of a technically qualified person.
(b) The Commission may notify the licensee not to commence unattended
operation, or to cancel, suspend, or change the date of the beginning
of such operation as and when such action may appear to be in the
public interest, convenience, or necessity.
(Secs. 1, 2, 301, 307, 48 Stat., as amended 1064, 1081, 1083; (47
U.S.C. 151, 152, 301, 307))
[ 37 FR 3292 , Feb. 12, 1972, as amended at 41 FR 29695 , July 19, 1976;
42 FR 61864 , Dec. 7, 1977; 43 FR 4617 , Feb. 3, 1978; 43 FR 25127 , June
9, 1978; 49 FR 20671 , May 16, 1984; 50 FR 23422 , June 4, 1985; 50 FR 32418 , Aug. 12, 1985]
Goto Section: 78.51 | 78.55
Goto Year: 2009 |
2011
CiteFind - See documents on FCC website that
cite this rule
Want to support this service?
Thanks!
Report errors in
this rule. Since these rules are converted to HTML by machine, it's possible errors have been made. Please
help us improve these rules by clicking the Report FCC Rule Errors link to report an error.
hallikainen.com
Helping make public information public