FCC 90.671 Revised as of October 1, 2005
Goto Year:2004 |
2006
Sec. 90.671 Field strength limits.
The predicted or measured field strength at any location on the border of
the MTA service area for MTA licensees shall not exceed 40 dBuV/m unless all
bordering MTA licensees agree to a higher field strength. MTA licensees are
also required to coordinate their frequency usage with so-channel adjacent
MTA licensees and all other affected parties. To the extent that a single
entity obtains licenses for adjacent MTAs on the same channel block, it will
not be required to coordinate its operations in this manner. In the event
that this standard conflicts with the MTA licensee's obligation to provide
co-channel protection to incumbent licensees under Sec. 90.621(b), the
requirements of Sec. 90.621(b) shall prevail.
[ 60 FR 21992 , May 4, 1995]
Procedures and Process—Unacceptable Interference
CiteFind - See documents on FCC website that
cite this rule
Want to support this service?
Thanks!
Report errors in
this rule. Since these rules are converted to HTML by machine, it's possible errors have been made. Please
help us improve these rules by clicking the Report FCC Rule Errors link to report an error.