FCC 73.765 Revised as of October 1, 2005
Goto Year:2004 |
2006
Sec. 73.765 Determining operating power.
The operating power specified in Sec. 73.751 shall be determined by use of a
calibrated dummy load or by any other method specified by the licensee and
accepted by the Commission. Such method may subsequently be used by the
licensee to maintain the authorized operating power.
(Secs. 4, 5, 303, 48 Stat., as amended, 1066, 1068, 1082 (47 U.S.C. 154,
155, 303))
[ 38 FR 18895 , July 16, 1973, as amended at 44 FR 65765 , Nov. 15, 1979]
CiteFind - See documents on FCC website that
cite this rule
Want to support this service?
Thanks!
Report errors in
this rule. Since these rules are converted to HTML by machine, it's possible errors have been made. Please
help us improve these rules by clicking the Report FCC Rule Errors link to report an error.