FCC 73.61 Revised as of October 1, 2005
Goto Year:2004 |
2006
Sec. 73.61 AM directional antenna field strength measurements.
(a) Each AM station using a directional antenna must make field strength
measurements at the monitoring point locations specified in the instrument
of authorization, as often as necessary to ensure that the field at those
points does not exceed the values specified in the station authorization.
Additionally, stations not having an approved sampling system must make the
measurements once each calendar quarter at intervals not exceeding 120 days.
The provision of this paragraph supersedes any schedule specified on a
station license issued prior to January 1, 1986. The results of the
measurements are to be entered into the station log pursuant to the
provisions of Sec. 73.1820.
(b) Partial proof of performance measurements using the procedures described
in Sec. 73.154 must be made whenever the licensee has reason to believe that the
radiated field may be exceeding the limits for which the station was most
recently authorized to operate.
(c) A station may be directed to make a partial proof of performance by the
FCC whenever there is an indication that the antenna is not operating as
authorized.
[ 50 FR 47054 , Nov. 14, 1985]
CiteFind - See documents on FCC website that
cite this rule
Want to support this service?
Thanks!
Report errors in
this rule. Since these rules are converted to HTML by machine, it's possible errors have been made. Please
help us improve these rules by clicking the Report FCC Rule Errors link to report an error.