Goto Section: 73.1510 | 73.1520 | Table of Contents
FCC 73.1515
Revised as of October 1, 2005
Goto Year:2004 |
2006
Sec. 73.1515 Special field test authorizations.
(a) A special field test authorization may be issued to conduct field
strength surveys to aid in the selection of suitable sites for broadcast
transmission facilities, determine coverage areas, or to study other factors
influencing broadcast signal propagation. The applicant for the
authorization must be qualified to hold a license under section 303(1)(l) of
the Communications Act.
(b) Requests for authorizations to operate a transmitter under a Special
field test authorization must be in writing using an informal application in
letter form, signed by the applicant and including the following
information:
(1) Purpose, duration and need for the survey.
(2) Frequency, transmitter output powers and time of operation.
(3) A brief description of the test antenna system, its estimated effective
radiated field and height above ground or average terrain, and the
geographic coordinates of its proposed location(s).
(c) Operation under a special field test authorization is subject to the
following conditions:
(1) No objectionable interference will result to the operation of other
authorized radio services; in this connection, the power requested shall not
exceed that necessary for the purposes of the test.
(2) The carriers will be unmodulated except for the transmission of a
test-pattern on a visual TV transmitter, and for hourly voice station
identification on aural AM, FM and TV transmitters.
(3) The transmitter output power or antenna input power may not exceed those
specified in the test authorization and the operating power must be
maintained at a constant value for each phase of the tests.
(4) The input power to the final amplifier stage, and the AM antenna current
or the FM or TV transmitter output power must be observed and recorded at
half hour intervals and at any time that the power is adjusted or changed.
Copies of these records must be submitted to the FCC with the required
report.
(5) The test equipment may not be permanently installed, unless such
installation has been separately authorized. Mobile units are not deemed
permanent installations.
(6) Test transmitters must be operated by or under the immediate direction
of an operator holding a commercial radio operator license (any class,
unless otherwise endorsed).
(7) A report, containing the measurements, their analysis and other results
of the survey shall be filed with the FCC in Washington, DC within sixty
(60) days following the termination of the test authorization.
(8) The test transmission equipment, installation and operation thereof need
not comply with the requirements of FCC rules and standards except as
specified in this section if the equipment, installation and operation are
consistent with good engineering principles and practices.
(d) A special field test authorization may be modified or terminated by
notification from the FCC if in its judgment such action will promote the
public interest, convenience and necessity.
[ 44 FR 58734 , Oct. 11, 1979, as amended at 46 FR 35463 , July 8, 1981; 49 FR 4211 , Feb. 3, 1984; 49 FR 20670 , May 16, 1984]
Goto Section: 73.1510 | 73.1520
Goto Year: 2004 |
2006
CiteFind - See documents on FCC website that
cite this rule
Want to support this service?
Thanks!
Report errors in
this rule. Since these rules are converted to HTML by machine, it's possible errors have been made. Please
help us improve these rules by clicking the Report FCC Rule Errors link to report an error.
hallikainen.com
Helping make public information public