Sec. 32.2423 Buried cable.
(a) This account shall include the original cost of buried cable as well as
the cost of other material used in the construction of such plant. This
account shall also include the cost of trenching for and burying cable run
in conduit not classifiable to Account 2441, Conduit Systems. Subsidiary
record categories, as defined below, are to be maintained for nonmetallic
buried cable and metallic buried cable.
(1) Nonmetallic cable. This subsidiary record category shall include the
original cost of optical fiber cable and other associated material used in
constructing a physical path for the transmission of telecommunications
signals.
(2) Metallic cable. This subsidiary record category shall include the
original cost of single or paired conductor cable, wire and other associated
material used in constructing a physical path for the transmission of
telecommunications signals.
(b) The cost of pumping water out of manholes and of cleaning manholes and
ducts in connection with construction work and the cost of permits and
privileges for the construction of cable and wire facilities shall be
included in the account chargeable with such construction.
Goto Section: 32.2422 | 32.2424
Goto Year: 2004 |
2006
CiteFind - See documents on FCC website that
cite this rule
Want to support this service?
Thanks!
Report errors in
this rule. Since these rules are converted to HTML by machine, it's possible errors have been made. Please
help us improve these rules by clicking the Report FCC Rule Errors link to report an error.
hallikainen.com
Helping make public information public