Sec. 90.755 Procedures for license modification.
(a) A Phase I non-nationwide licensee seeking modification of its
authorization to relocate its authorized base station in accordance with
the provisions of Sec. 90.753 must file the following on or before May
1, 1996:
(1) Form 600 requesting license modification, and providing all
applicable information;
(2) Certification that the location of its proposed base station is
in conformance with the provisions of Sec. 90.753, or, as provided in
Sec. 90.753(d), a letter evidencing consent of a co-channel licensee
that the licensee may be authorized less than 120 km from the co-channel
licensee;
(3) If applicable, the required certification by a licensee with a
Special Temporary Authority, in accordance with Sec. 90.753(c);
(4) If applicable, certification that the licensee has constructed
its base station and placed it in operation, or commenced service, at
its initially authorized location on or before March 11, 1996.
(b) A licensee seeking modification of its authorization to relocate
its base station in accordance with the provisions of Sec. 90.753,
should file, on or before March 11, 1996, either a modification
application, as provided in paragraph (a) of this section, or a letter
certifying to the Commission its intent to file an application to modify
its authorization to relocate its base station. For a licensee that has
not constructed its authorized base station and placed it in operation,
or commenced service, by March 11, 1996, this filing will serve to
extend the licensee's construction requirement in accordance with the
provisions of Sec. 90.757.
[61 1997 FR 3845 , Feb. 2, 1996]
CiteFind - See documents on FCC website that
cite this rule
Want to support this service?
Thanks!
Report errors in
this rule. Since these rules are converted to HTML by machine, it's possible errors have been made. Please
help us improve these rules by clicking the Report FCC Rule Errors link to report an error.