Sec. 74.951 Modification of transmission systems.
Formal application on FCC Form 330 is required for any of the
following changes or modifications of the transmission systems:
(a) Replacement of the transmitter as a whole, except replacement
with a transmitter of identical power rating which has been type
accepted by the FCC for use by instructional TV fixed stations, or any
change which could result in a change in the electrical characteristics
or performance of the station. Upon the installation or modification of
the transmitting equipment for which prior FCC authority is not required
under the provisions of this paragraph, the licensee shall place in the
station records a certification that the new installation complies in
all respects with the technical requirements of this part and the terms
of the station authorization.
(b) Any change in the antenna system affecting the direction of
radiation, directive radiation pattern, antenna gain, or radiated power.
(c) Any change in the overall height of the antenna structure,
except where notice to the Federal Aviation Administration is
specifically not required under Sec. 17.14(b) of the FCC Rules.
(d) Any change in the location of the transmission system except a
move within the same building or upon the same antenna supporting
structure.
(e) A change in frequency assignment.
(f) A change in the operating power.
(g) Any addition of receiving locations or to modify such a location
to a receive and response station.
[ 45 FR 26068 , Apr. 17, 1980, as amended at 50 FR 26761 , June 28, 1985;
52 FR 3806 , Feb. 6, 1987; 53 FR 36788 , Sept. 22, 1988]
CiteFind - See documents on FCC website that
cite this rule
Want to support this service?
Thanks!
Report errors in
this rule. Since these rules are converted to HTML by machine, it's possible errors have been made. Please
help us improve these rules by clicking the Report FCC Rule Errors link to report an error.