Goto Section: 73.58 | 73.62 | Table of Contents
FCC 73.61
Revised as of
Goto Year:1996 |
1998
Sec. 73.61 AM directional antenna field strength measurements.
(a) Each AM station using a directional antenna must make field
strength measurements at the monitoring point locations specified in the
instrument of authorization, as often as necessary to ensure that the
field at those points does not exceed the values specified in the
station authorization. Additionally, stations not having an approved
sampling system must make the measurements once each calendar quarter at
intervals not exceeding 120 days. The provision of this paragraph
supersedes any schedule specified on a station license issued prior to
January 1, 1986. The results of the measurements are to be entered into
the station log pursuant to the provisions of Sec. 73.1820.
(b) Partial proof of performance measurements using the procedures
described in Sec. 73.154 must be made whenever the licensee has reason
to believe that the radiated field may be exceeding the limits for which
the station was most recently authorized to operate.
(c) A station may be directed to make a partial proof of performance
by the FCC whenever there is an indication that the antenna is not
operating as authorized.
[ 50 FR 47054 , Nov. 14, 1985]
Goto Section: 73.58 | 73.62
Goto Year: 1996 |
1998
CiteFind - See documents on FCC website that
cite this rule
Want to support this service?
Thanks!
Report errors in
this rule. Since these rules are converted to HTML by machine, it's possible errors have been made. Please
help us improve these rules by clicking the Report FCC Rule Errors link to report an error.
hallikainen.com
Helping make public information public