Sec. 73.45 AM antenna systems.
(a) All applicants for new, additional, or different AM station
facilities and all licensees requesting authority to change the
transmitting system site of an existing station must specify an antenna
system, the efficiency of which complies with the requirements for the
class and power of station. (See Secs. 73.186 and 73.189.)
(1) An application for authority to install an AM broadcast antenna
must specify a definite site and include full details of the antenna
system design and expected performance.
(2) All data necessary to show compliance with the terms and
conditions of the construction permit must be filed with the application
for the station license to cover the construction. If the station has
constructed a directional antenna, a directional proof of performance
must be filed. See Secs. 73.150 through 73.157.
(b) The simultaneous use of a common antenna or antenna structure by
more than one AM station or by a station of any other type or service
may be authorized provided:
(1) Engineering data are submitted showing that satisfactory
operation of each station will be obtained without adversely affecting
the operation of the other station(s).
(2) The minimum field strength for each AM station complies with
Sec. 73.189(b).
(c) Should any changes be made or otherwise occur which would
possibly alter the resistance of the antenna system, the licensee must
commence the determination of the operating power by a method described
in Sec. 73.51(a)(1) or (d). (If the changes are due to the construction
of FM or TV transmitting facilities, see Secs. 73.316 and 73.685.) Upon
completion of any necessary repairs or adjustments, or upon completion
of authorized construction or modifications, the licensee must make a
new determination of the antenna resistance using the procedures
described in Sec. 73.54. Operating power should then be determined by a
direct method as described in Sec. 73.51. Notification of the value of
resistance of the antenna system must be filed with the FCC in
Washington, DC., as follows:
(1) Whenever the measurements show that the antenna or common point
resistance differs from that shown on the station authorization by more
than 2%, FCC Form 302 must be filed with the information and measurement
data specified in Sec. 73.54(d).
(2) Whenever AM stations use direct reading power meters pursuant to
Sec. 73.51, notification to the FCC in Washington, DC, must be filed in
accordance with Sec. 73.54(e).
[43 1997 FR 53735 , Nov. 17, 1978, as amended at 45 FR 28141 , Apr. 28, 1980;
47 FR 8589 , Mar. 1, 1982; 50 FR 32416 , Aug. 12, 1985; 51 FR 2707 ; Jan.
21, 1986; 51 FR 26250 , July 22, 1986]
CiteFind - See documents on FCC website that
cite this rule
Want to support this service?
Thanks!
Report errors in
this rule. Since these rules are converted to HTML by machine, it's possible errors have been made. Please
help us improve these rules by clicking the Report FCC Rule Errors link to report an error.