Goto Section: 32.2422 | 32.2424 | Table of Contents
FCC 32.2423
Revised as of
Goto Year:1996 |
1998
Sec. 32.2423 Buried cable.
(a) This account shall include the original cost of buried cable as
well as the cost of other material used in the construction of such
plant. This account shall also include the cost of trenching for and
burying cable run in conduit not classifiable to Account 2441, Conduit
Systems. Subsidiary record categories, as defined below, are to be
maintained for nonmetallic buried cable and metallic buried cable.
(1) Nonmetallic cable. This subsidiary record category shall include
the original cost of optical fiber cable and other associated material
used in constructing a physical path for the transmission of
telecommunications signals.
(2) Metallic cable. This subsidiary record category shall include
the original cost of single or paired conductor cable, wire and other
associated material used in constructing a physical path for the
transmission of telecommunications signals.
(b) The cost of pumping water out of manholes and of cleaning
manholes and ducts in connection with construction work and the cost of
permits and privileges for the construction of cable and wire facilities
shall be included in the account chargeable with such construction.
Goto Section: 32.2422 | 32.2424
Goto Year: 1996 |
1998
CiteFind - See documents on FCC website that
cite this rule
Want to support this service?
Thanks!
Report errors in
this rule. Since these rules are converted to HTML by machine, it's possible errors have been made. Please
help us improve these rules by clicking the Report FCC Rule Errors link to report an error.
hallikainen.com
Helping make public information public