Goto Section: 22.927 | 22.933 | Table of Contents

FCC 22.929
Revised as of
Goto Year:1996 | 1998
Sec. 22.929  Application requirements for the Cellular Radiotelephone 
          Service.

    In addition to information required by subparts B and D of this 
part, applications for authorization in the Cellular Radiotelephone 
Service must contain the applicable supplementary information described 
in this section. Initial applications for new cellular systems must also 
comply with Sec. 22.953.

[[Page 196]]

    (a) Administrative information. The following information is 
required either by FCC Form 600, Schedule C, or as an exhibit.
    (1) The number of transmitter sites for which authorization is 
requested;
    (2) The call sign(s) of other facilities in the same area that are 
ultimately controlled by the real party in interest to the application;
    (3) If the application involves a service area boundary (SAB) 
extension (see Sec. 22.912), a statement as to whether the five year 
build-out period for the system on the relevant channel block in the 
market into which the SAB extends has elapsed, and whether the SAB 
extends into any unserved area in that market.
    (b) Technical information. The following information is required by 
FCC Form 600, Schedule C.
    (1) Location description; city; county; state; geographical 
coordinates correct to &177;1 second, the datum used (NAD 27 and 
NAD 83), site elevation above mean sea level, proximity to adjacent 
market boundaries and international borders;
    (2) Antenna manufacturer, model number and type, antenna height to 
tip above ground level, the height of the center of radiation of the 
antenna above the average terrain, the height of the antenna center of 
radiation above the average elevation of the terrain along each of the 8 
cardinal radials, antenna gain in the maximum lobe, the beamwidth of the 
maximum lobe of the antenna, a polar plot of the horizontal gain pattern 
of the antenna, the electric field polarization of the wave emitted by 
the antenna when installed as proposed;
    (3) The channel block requested, the maximum effective radiated 
power, the effective radiated power in each of the cardinal radial 
directions.
    (c) Maps. If the application proposes a change in the CGSA, it must 
include full size and reduced maps, and supporting engineering, as 
described in Sec. 22.953(a)(5)(i) through (iii).
[ 59 FR 59507 , Nov. 17, 1994, as amended at  59 FR 59954 , Nov. 21, 1994]


Goto Section: 22.927 | 22.933

Goto Year: 1996 | 1998
CiteFind - See documents on FCC website that cite this rule

Want to support this service?
Thanks!

Report errors in this rule. Since these rules are converted to HTML by machine, it's possible errors have been made. Please help us improve these rules by clicking the Report FCC Rule Errors link to report an error.
hallikainen.com
Helping make public information public