Sec. 2.938 Retention of records.
(a) For each equipment subject to the Commission's equipment
authorization standards, the responsible party shall maintain the
records listed as follows:
(1) A record of the original design drawings and specifications and
all changes that have been made that may affect compliance with the
standards and the requirements of Sec. 2.931.
(2) A record of the procedures used for production inspection and
testing to ensure conformance with the standards and the requirements of
Sec. 2.931.
(3) A record of the test results that demonstrate compliance with
the appropriate regulations in this chapter.
(b) The provisions of paragraph (a) of this section shall also apply
to a manufacturer of equipment produced under the provisions of
Sec. 2.929(b). The retention of the records by the manufacturer under
these circumstances shall satisfy the grantee's responsibility under
paragraph (a) of this section.
(c) The records listed in paragraph (a) of this section shall be
retained for one year for equipment subject to authorization under the
type acceptance or certification procedure, or for two years for
equipment subject to authorization under any other procedure, after the
manufacture of said equipment has been permanently discontinued, or
until the conclusion of an investigation or a proceeding if the
responsible party (or under paragraph (b) of this section the
manufacturer) is officially notified that an investigation or any other
administrative proceeding involving its equipment has been instituted.
(d) If radio frequency equipment is modified by any party other than
the original responsible party, and that party is not working under the
authorization of the original responsible party, the party performing
the modifications is not required to obtain the original design drawings
specified in paragraph (a)(1) of this section. However, the party
performing the modifications must maintain records showing the changes
made to the equipment along with the records required in paragraphs
(a)(3) of this section. A new equipment authorization may also be
[[Page 518]]
required. See, for example, Secs. 2.909, 2.924, 2.933, and 2.1043.
[62 1997 FR 10471 , Mar. 7, 1997]
CiteFind - See documents on FCC website that
cite this rule
Want to support this service?
Thanks!
Report errors in
this rule. Since these rules are converted to HTML by machine, it's possible errors have been made. Please
help us improve these rules by clicking the Report FCC Rule Errors link to report an error.