Sec. 2.1509 Environmental and duration tests.
The environmental and operational tests in Sec. 2.1509 (a) through
(e) are to be conducted on a single test unit in the order given below.
This sequence of tests also includes the electrical tests in
Secs. 2.1511, 2.1513 and 2.1515 of this part. The test unit is not to be
adjusted, nor
[[Page 550]]
is the battery to be replaced during these tests, and a log of battery
on-time should be maintained. The above tests are to be performed on the
same test unit. The tests in Sec. 2.1509 (f) through (i) may be run in
any sequence or may be performed on separate test units.
(a) Vibration test.
Step (1) Secure the EPIRB to the vibration table. The EPIRB is not
to be operated and should not activate while being vibrated.
Step (2) Subject the EPIRB to sinusoidal motion parallel to one of
the three major orthogonal axes under the following conditions:
A. Frequency (Hz) Peak amplitude (mm)
4-10.............................. 2.5
10-15............................. 0.8
15-25............................. 0.4
25-33............................. 0.2
B. The frequency is to be changed either linearly or logarithmically
with time between 4 Hz and 33 Hz such that a complete cycle (4 Hz to 33
Hz to 4 Hz) takes approximately 5 minutes.
C. The EPIRB is to be vibrated for at least 30 minutes or six
complete cycles.
Step (3) Remount the EPIRB, if necessary, and repeat step 2 for each
of the other two major orthogonal axes.
Step (4) Upon completion of the test, perform an exterior mechanical
inspection and verify operation by turning the unit on and observing the
RF power indicator on the unit or monitoring the transmission with a
receiver. Record test results.
(b) Thermal shock tests. These tests are to be performed on EPIRBs
which are required or intended to float.
(1) Low temperature thermal shock test.
Step (1) Place the EPIRB in a temperature chamber for at least 3
hours at -20 deg.C or colder. The EPIRB is not to be operated while
being cooled.
Step (2) Immediately place the EPIRB in water that has been
maintained at +10 deg.C or warmer.
Step (3) After 15 minutes, perform as exterior mechanical inspection
and verify operation by turning the unit on and observing the RF power
indicator on the unit or monitoring the transmission with a receiver.
Record test results.
(2) High temperature thermal shock test.
Step (1) Place the EPIRB in a temperature chamber for at least 3
hours at +55 degrees C or warmer. The EPIRB is not to be operated while
being heated.
Step (2) Immediately float the EPIRB in water that is maintained at
+25 degrees C or colder.
Step (3) After 15 minutes, perform an exterior mechanical inspection
and verify operation by turning the unit on and observing the RF power
indicator on the unit or monitoring the transmission with a receiver.
Record test results.
(c) Salt fog test.
Step (1) Place the EPIRB in a salt fog chamber for a period of at
least 2 hours at a temperature of 35 deg.C (#2 deg.C)
before exposing it to salt fog. The EPIRB is to be turned off during
this test.
Step (2) With the chamber temperature maintained at 35 deg.C,
introduce salt fog at the saturation point for 48 hours. The salt fog is
to be prepared from a 5% (#1%) salt (sodium chloride
solution. For detailed guidance on the preparation of the solution and
the apparatus for generating salt fog, refer to MIL-STD-810D (19 July
1983), method 509.2.
Step (3) Upon completion of the salt fog exposure, the EPIRB is to
be airdried at room temperature for 12 hours and operation verified by
turning the unit on and observing the RF power indicator on the unit or
monitoring the transmission with a receiver. Record observations.
(d) Drop test. This test is to be performed on EPIRB which are
required or intended to float.
Step (1) Turn the EPIRB on, log the time and drop it three times
into water from a height of 20 meters. The water is to be deep enough so
that the EPIRB does not touch bottom when dropped. Each drop should be
initiated from a different orientation as follows: antenna vertical up;
antenna vertical down; antenna horizontal.
Step (2) Upon completion of the drop test, an exterior mechanical
inspection is to be performed and operation verified by observing the RF
power indicator on the unit or monitoring the transmission with a
receiver. Record observations. Turn the test unit off and log the total
on-time.
(e) Forty-eight hour operational test. This test includes the
battery life test and all the electrical tests given in Secs. 2.1511,
2.1513 and 2.1515 of this part, at various temperatures. The tests are
to be performed on the same EPIRB in the sequence specified herein. Be
sure to record the on-time of the unit during each test. No more than 8
hours of total on-time is permitted before commencing step 4. When
operating the EPIRB in the environmental chamber, a non-radiating load
may be substituted for the antenna provided it is
[[Page 551]]
electrically equivalent to the standard antenna and does not reduce the
battery current drain.
Step (1) Perform the radiated emissions test in Sec. 2.1511 of this
part.
Step (2) Perform the modulation characteristic tests in Sec. 2.1513
of this part.
Step (3) Perform the spectral tests in Sec. 2.1515 of this part.
Step (4) With the EPIRB off, place unit in an environmental chamber
at a temperature of -20 deg.C for at least 2 hours.
Step (5) With the EPIRB in the chamber, repeat the carrier frequency
test in Sec. 2.1515(d) of this part. (Leave the EPIRB turned on.)
Step (6) Near the end of 48 hours of total on-time for the EPIRB,
repeat the carrier frequency test in Sec. 2.1515(d) of this part.
Step (7) At the end of 48 hours of total on-time, remove EPIRB from
the chamber and immediately repeat the PERP test for the fundamental
emissions in Sec. 2.1511(c) of this part. The unit should be maintained
at -20 deg.C to the extent possible for this test.
(f) Float free and activation test. This test is required only for
Class A EPIRBs.
Step (1) The EPIRB is to be installed in the automatic release
mechanism and the assembly is to be mounted on a fixture simulating a
deck or bulkhead as per manufacturer' installation instructions.
Step (2) Submerge the fixture in water in its normal mounted
orientation. The EPIRB must float free before reaching a depth of 4
meters and should automatically activate. Activation is to be verified
by observing the RF power indicator on the unit or monitoring the
transmission with a receiver.
If the EPIRB is equipped with an automatically deployable antenna, the
antenna must properly deploy during each immersion. Record observations.
(g) Stability and buoyancy test. This test is to be performed on
EPIRBs which are required or intended to float. This test is to be
conducted in fresh water.
Step (1) With the antenna deployed in its normal operating position,
submerge the EPIRB in a horizontal position just below the surface of
the water.
Step (2) Release the EPIRB and observe the amount of time required
for it to come to an upright position. It must reach its upright
position within one second from each position.
The EPIRB must have a reserve buoyancy of at least 5% of its gross
weight. It must also float upright in calm water with the base of the
antenna a minimum of 5 cm above the water. Record the time required for
the test unit to right itself.
(h) Temperature/frequency test. The frequency stability shall be
measured over an ambient temperature from -20 deg. to +55 deg.C at
intervals of not more than 10 deg.C. A period of time sufficient to
stabilize all of the components of the oscillator circuit at each
temperture level shall be allowed prior to frequency measurement.
Step (1) Place the EPIRB in the environmental test chamber.
Step (2) Adjust the temperature in the chamber to +20 deg.C and
allow sufficient time for the oscillator to stabilize at that
temperature.
Step (3) Measure the carrier frequency in accordance with the
procedure in Sec. 2.1515(d) of this part. Record the carrier frequency
in Hertz. The carrier frequency at +20 deg.C is the reference for
determining the frequency tolerance.
Step (4) Increase the temperature in the chamber to +55 deg.C and
allow sufficient time for the oscillator to stabilize at that
temperature. Measure the carrier frequency using the procedure in
Sec. 2.1515(d) of this part.
Step (5) Reduce the temperature in the chamber in 10 deg.C maximum
increments until -20 deg.C is reached. At each new temperature, allow
sufficient time for the oscillator to stabilize at that temperature.
Measure the temperature and frequency in each case and plot the
frequency vs temperature from -20 deg. to +55 deg.C.
(i) Leakage and immersion test.
Step (1) Completely submerge the EPIRB in water for 48 hours. The
EPIRB is to be turned off during this test.
Step (2) Remove the EPIRB from the water and wipe dry.
Step (3) Verify operation by briefly turning the EPIRB on and
observing the RF power indicator on the unit or monitoring the
transmission with a receiver.
Step (4) Open the EPIRB for examination. There is to be no water
inside the unit. Record observations.
CiteFind - See documents on FCC website that
cite this rule
Want to support this service?
Thanks!
Report errors in
this rule. Since these rules are converted to HTML by machine, it's possible errors have been made. Please
help us improve these rules by clicking the Report FCC Rule Errors link to report an error.