Sec. 15.201 Equipment authorization requirement.
(a) Intentional radiators operated as carrier current systems and
devices operated under the provisions of Secs. 15.211, 15.213 and 15.221
shall be verified pursuant to the procedures in subpart J of part 2 of
this chapter prior to marketing.
(b) Except as otherwise exempted in paragraph (c) of this section
and in Sec. 15.23 of this part, all intentional radiators operating
under the provisions of this part shall be certificated by the
Commission pursuant to the procedures in subpart J of part 2 of this
chapter prior to marketing.
(c) For devices such as perimeter protection systems which, in
accordance with Sec. 15.31(d), are required to be measured at the
installation site, each application for certification must be
accompanied by a statement indicating that the system has been tested at
three installations and found to comply at each installation. Until such
time as certification is granted, a given installation of a system that
was measured for the submission for certification will be considered to
be in compliance with the provisions of this chapter, including the
marketing regulations in subpart I of part 2 of this chapter, if tests
at that installation show the system to be in compliance with the
relevant technical requirements. Similarly, where measurements must be
performed on site for equipment subject to verification, a given
installation that has been verified to demonstrate compliance with the
applicable standards will be considered to be in compliance with the
provisions of this chapter, including the marketing regulations in
subpart I of part 2 of this chapter.
(d) For perimeter protection systems operating in the frequency
bands allocated to television broadcast stations operating under part 73
of this chapter, the holder of the grant of certification must test each
installation prior to initiation of normal operation to verify
compliance with the technical standards and must maintain a list of all
installations and records of measurements. For perimeter protection
systems operating outside of the frequency bands allocated to television
broadcast stations, upon receipt of a grant of certification, further
testing of the same or similar type of system or installation is not
required.
CiteFind - See documents on FCC website that
cite this rule
Want to support this service?
Thanks!
Report errors in
this rule. Since these rules are converted to HTML by machine, it's possible errors have been made. Please
help us improve these rules by clicking the Report FCC Rule Errors link to report an error.