FCC Web Documents citing 90.727
- http://transition.fcc.gov/Bureaus/Wireless/Notices/1998/fcc98025.pdf http://transition.fcc.gov/Bureaus/Wireless/Notices/1998/fcc98025.txt http://transition.fcc.gov/Bureaus/Wireless/Notices/1998/fcc98025.wp
- (change to allow electronic filing of information via ULS). 90.711 Processing of applications (move to consolidated Part 1 1.926 Rule). 90.723(a), (i) Selection and assignment of frequencies (change to allow90.723(a), (i) electronic filing of information via ULS). 90.725(d), (e) Construction requirements for Phase I licenses (change 90.725(d), (e), (i) to allow electronic filing of information via ULS; add notification section). 90.727(a) Extended implementation schedules (change to allow 90.727(a) electronic filing of information via ULS). 90.733(h)(2) Permissible operations (change cross-reference). 90.733(h)(2) 90.737(b)-(e) Supplemental reports required of licensees (change to 90.737(b)-(e) allow electronic filing of information via ULS). 90.751 Minor modifications add "of" non-nationwide licenses 90.751 (change to cross-reference new rule sections). 90.753(d), (e) Conditions of license modifications (eliminate letter 90.753(d), (e) filing
- http://wireless.fcc.gov/auctions/18/releases/220_e.pdf
- report requirements of paragraphs (d) and (e) of this section, licensees operating stations for fixed operation on a primary basis instead of, or in addition to, stations for land mobile or paging operations on a primary basis in a given geographic area may demonstrate how such fixed stations are providing substantial service to the public in those geographic areas. Sec. 90.727 Extended implementation schedules for Phase I licensees. Except for nationwide and commercial systems, a period of up to three (3) years may be authorized for constructing and placing a system in operation if: (a) The applicant submits justification for an extended implementation period. The justification must include reasons for requiring an extended construction period, the proposed construction schedule (with milestones),
- http://wireless.fcc.gov/auctions/18/releases/fc970057.pdf http://wireless.fcc.gov/auctions/18/releases/fc970057.txt http://wireless.fcc.gov/auctions/18/releases/fc970057.wp
- stations for fixed operation on a primary basis instead of, or in addition to, stations for land mobile or paging operations on a primary basis in a given geographic area may demonstrate how such fixed stations are providing substantial service to the public in those geographic areas. Federal Communications Commission FCC 97-57 PAGE B-16 17. The section heading of Section 90.727 is revised to read as follows: Section 90.727 Extended implementation schedules for Phase I licensees. * * * * * 18. Section 90.729 is revised to read as follows: Section 90.729 Limitations on power and antenna height. (a) The permissible effective radiated power (ERP) with respect to antenna heights for land mobile, paging, or fixed stations transmitting on frequencies in
- http://wireless.fcc.gov/auctions/24/releases/pt1_pt90.pdf http://wireless.fcc.gov/auctions/24/releases/pt1_pt90.wp
- report requirements of paragraphs (d) and (e) of this section, licensees operating stations for fixed operation on a primary basis instead of, or in addition to, stations for land mobile or paging operations on a primary basis in a given geographic area may demonstrate how such fixed stations are providing substantial service to the public in those geographic areas. § 90.727 Extended implementation schedules for Phase I licensees. Except for nationwide and commercial systems, a period of up to three (3) years may be authorized for constructing and placing a system in operation if: (a) The applicant submits justification for an extended implementation period. The justification must include reasons for requiring an extended construction period, the proposed construction schedule (with milestones),
- http://wireless.fcc.gov/licensing/index.htm?job=const_req_by_service
- CAPTION: Land Mobile Radio Services Radio Service/Frequency Band Construction/Coverage Requirements Radio Service Code 47 C.F.R. Part Method of Notification 220 MHz (Public Safety) Construct and place into operation within 12 months of initial license grant date. Alternatively, may apply for extended implementation - up to 3 years may be authorized for constructing and placing a system in operation. QM 90.725(f), 90.727 601 Main Form and Schedule K 220 MHz Phase I (Nationwide Licenses) Construct and place into operation at least 10% of designated geographic areas within 2 years of initial license grant, 40% within 4 years, 70% within 6 years, and 100% of the designated geographic areas within 10 years on initial license grant. Each benchmark has a requirement for base
- http://www.fcc.gov/Bureaus/Wireless/Notices/1998/fcc98025.pdf http://www.fcc.gov/Bureaus/Wireless/Notices/1998/fcc98025.txt http://www.fcc.gov/Bureaus/Wireless/Notices/1998/fcc98025.wp
- (change to allow electronic filing of information via ULS). 90.711 Processing of applications (move to consolidated Part 1 1.926 Rule). 90.723(a), (i) Selection and assignment of frequencies (change to allow90.723(a), (i) electronic filing of information via ULS). 90.725(d), (e) Construction requirements for Phase I licenses (change 90.725(d), (e), (i) to allow electronic filing of information via ULS; add notification section). 90.727(a) Extended implementation schedules (change to allow 90.727(a) electronic filing of information via ULS). 90.733(h)(2) Permissible operations (change cross-reference). 90.733(h)(2) 90.737(b)-(e) Supplemental reports required of licensees (change to 90.737(b)-(e) allow electronic filing of information via ULS). 90.751 Minor modifications add "of" non-nationwide licenses 90.751 (change to cross-reference new rule sections). 90.753(d), (e) Conditions of license modifications (eliminate letter 90.753(d), (e) filing