FCC Web Documents citing 90.651
- http://hraunfoss.fcc.gov/edocs_public/attachmatch/DA-00-1171A1.doc http://hraunfoss.fcc.gov/edocs_public/attachmatch/DA-00-1171A1.pdf http://hraunfoss.fcc.gov/edocs_public/attachmatch/DA-00-1171A1.txt
- of the rights-of-way of all operating rail lines in the United States. PTC, once called an Advanced Train Control System (ATCS), operates on six Industrial/Land Transportation frequency pairs in the 900 MHz band and is designed to prevent train collisions, high speed accidents, or incursions into locations reserved for roadway workers. See Waiver of Sections 90.621(d), 90.623(a), 90.629, 90.633, and 90.651(c) of the Commission's Rules to License Use of Six Conventional 900 MHz Frequency Pairs for an Advanced Train Control System, 3 FCC Rcd 427, 427 ¶¶ 1-6 (1988). If this petition for a single geographic license is granted, AAR plans to issue sub-licenses to the individual railroads who use ATCS/PTC while it maintains a computerized database of all site-specific information
- http://hraunfoss.fcc.gov/edocs_public/attachmatch/DA-01-359A1.doc http://hraunfoss.fcc.gov/edocs_public/attachmatch/DA-01-359A1.pdf http://hraunfoss.fcc.gov/edocs_public/attachmatch/DA-01-359A1.txt
- (limiting extended implementation periods to three years), 90.629(b) (requiring annual progress reports by licensees with extended implementation periods, and providing that exclusivity for conventional channels cancels automatically if the implementation schedule is not met), 90.633(a) (setting a loading requirement of seventy mobile units), 90.633(c) (requiring construction within eight months of license grant unless an extended implementation period is granted), and 90.651(c) (requiring loading report within eight months of license grant) of the Commission's Rules. In 1988, the Commission granted AAR's request. The Commission allowed AAR ten years in which to complete the proposed ATCS project. Rather than grant AAR the exclusive use of the six frequencies nationwide, as AAR had requested, the Commission established an eighty-mile zone of protection around each
- http://hraunfoss.fcc.gov/edocs_public/attachmatch/DA-03-647A1.doc http://hraunfoss.fcc.gov/edocs_public/attachmatch/DA-03-647A1.pdf http://hraunfoss.fcc.gov/edocs_public/attachmatch/DA-03-647A1.txt
- and Use of the Universal Licensing System in the Wireless Telecommunications Services, Report and Order, WT Docket No. 98-20, 13 FCC Rcd 21027, 21076 ¶ 106 (1998). Prior to implementation of ULS, notifications were required for 470-512 MHz frequencies in accordance with Section 90.313 of the Commission's Rules, 47 C.F.R. § 90.313 and 800/900 MHz frequencies in accordance with Section 90.651 of the Commission's Rules, 47 C.F.R. § 90.651. Prior to implementation of ULS, notifications were required for 470-512 MHz frequencies in accordance with Section 90.313 of the Commission's Rules, 47 C.F.R. § 90.313 and 800/900 MHz frequencies in accordance with Section 90.651 of the Commission's Rules, 47 C.F.R. § 90.651. Prior to implementation of ULS, activation notices were required in
- http://hraunfoss.fcc.gov/edocs_public/attachmatch/DA-10-1223A2.pdf http://hraunfoss.fcc.gov/edocs_public/attachmatch/DA-10-1223A2.txt
- Accepted Equipment) 3060-0228 WTB-MD Section 80.59 Compulsory ship inspections 3060-0259 WTB-MD Section 90.263 Substitution of frequencies below 25 MHz 3060-0261 WTB-MD Section 90.215, Transmitter Measurements 3060-0262 WTB-MD Section 90.179, Shared Use of Radio Stations 3060-0264 WTB-MD Section 80.413 On-board Station Equipment Records 3060-0265 WTB-MD Section 80.868, Card of Instructions 3060-0270 WTB-MD Section 90.443 Content of Station Records 3060-0281 WTB-MD Section 90.651, Supplemental Reports Required of Licensees Authorized Under this Subpart 3060-0286 WTB-MD Section 80.302, Notice of Discontinuance, Reduction, or Impairment of Service Involving a Distress Watch 3060-0290 WTB-MD Section 90.517, Report of Operation (under Developmental Authorization) 3060-0291 WTB-MD Sections 90.477(a), (b)(2), (d)(2), and (d)(3), Interconnected Systems 3060-0295 WTB-MD Sections 90.607(b)(1) and (c)(1), Supplemental Information to be Furnished by Applicants for Facilities
- http://hraunfoss.fcc.gov/edocs_public/attachmatch/DA-10-1223A2_Rcd.pdf
- Station 3060-0223 WTB-MD Section 90.129, Supplemental Information to be Routinely Submitted with Applications(Non- Type Accepted Equipment) 3060-0228 WTB-MD Section 80.59 Compulsory ship inspections 3060-0259 WTB-MD Section 90.263 Substitution of frequencies below 25 MHz 3060-0261 WTB-MD Section 90.215, Transmitter Measurements 3060-0262 WTB-MD Section 90.179, Shared Use of Radio Stations 3060-0264 WTB-MD Section 80.413 On-board Station Equipment Records 8342 3060-0281 WTB-MD Section 90.651, Supplemental Reports Required of Licensees Authorized Under this Subpart 3060-0286 WTB-MD Section 80.302, Notice of Discontinuance, Reduction, or Impairment of Service Involving a Distress Watch 3060-0290 WTB-MD Section 90.517, Report of Operation (under Developmental Authorization) 3060-0291 WTB-MD Sections 90.477(a), (b)(2), (d)(2), and (d)(3), Interconnected Systems 3060-0295 WTB-MD Sections 90.607(b)(1) and (c)(1), Supplemental Information to be Furnished by Applicants for Facilities
- http://transition.fcc.gov/Bureaus/Wireless/Notices/1998/fcc98025.pdf http://transition.fcc.gov/Bureaus/Wireless/Notices/1998/fcc98025.txt http://transition.fcc.gov/Bureaus/Wireless/Notices/1998/fcc98025.wp
- period (change to allow 90.629(c), (d) electronic filing of information via ULS). 90.631(b), (f) Trunked system loading construction and authorization 90.631(b), (f) requirements (change to allow electronic filing of information via ULS). 90.633(e) Conventional systems loading requirements (change to 90.633(e) allow electronic filing of information via ULS). 90.645(g),(h) Permissible operations (change to allow electronic filing 90.645(g),(h) of information via ULS). 90.651(b), (c), Supplemental reports required of licenses authorized 90.651(b), (c), (d) (d) under this subpart (change to allow electronic filing of information via ULS). 90.657 Temporary permit (move to consolidated Part 1 Rule). 1.931 90.658(a) Loading data required... (change to allow electronic 90.658(a) filing of information via ULS). 90.659 Change in number or location of base stations or 90.659 transmitters (change
- http://www.fcc.gov/Bureaus/Wireless/Notices/1998/fcc98025.pdf http://www.fcc.gov/Bureaus/Wireless/Notices/1998/fcc98025.txt http://www.fcc.gov/Bureaus/Wireless/Notices/1998/fcc98025.wp
- period (change to allow 90.629(c), (d) electronic filing of information via ULS). 90.631(b), (f) Trunked system loading construction and authorization 90.631(b), (f) requirements (change to allow electronic filing of information via ULS). 90.633(e) Conventional systems loading requirements (change to 90.633(e) allow electronic filing of information via ULS). 90.645(g),(h) Permissible operations (change to allow electronic filing 90.645(g),(h) of information via ULS). 90.651(b), (c), Supplemental reports required of licenses authorized 90.651(b), (c), (d) (d) under this subpart (change to allow electronic filing of information via ULS). 90.657 Temporary permit (move to consolidated Part 1 Rule). 1.931 90.658(a) Loading data required... (change to allow electronic 90.658(a) filing of information via ULS). 90.659 Change in number or location of base stations or 90.659 transmitters (change
- http://www.fcc.gov/Bureaus/Wireless/Public_Notices/2000/da001171.doc http://www.fcc.gov/Bureaus/Wireless/Public_Notices/2000/da001171.txt
- of the rights-of-way of all operating rail lines in the United States. PTC, once called an Advanced Train Control System (ATCS), operates on six Industrial/Land Transportation frequency pairs in the 900 MHz band and is designed to prevent train collisions, high speed accidents, or incursions into locations reserved for roadway workers. See Waiver of Sections 90.621(d), 90.623(a), 90.629, 90.633, and 90.651(c) of the Commission's Rules to License Use of Six Conventional 900 MHz Frequency Pairs for an Advanced Train Control System, 3 FCC Rcd 427, 427 ¶¶ 1-6 (1988). If this petition for a single geographic license is granted, AAR plans to issue sub-licenses to the individual railroads who use ATCS/PTC while it maintains a computerized database of all site-specific information
- http://www.fcc.gov/ogc/documents/opinions/1997/keller.html http://www.fcc.gov/ogc/documents/opinions/1997/keller.wp
- to Permit New York Metropolitan Area Public Safety Agencies to Use Frequencies at 482-488 MHZ on a Conditional Basis, Order, 10 F.C.C.R. 4466, 4468 (1995) (waiving requirements because "public safety agencies in the New York City metropolitan area have an urgent and immediate need for additional spectrum capacity for public safety communications"); Waiver of Sections 90.621(d), 90.623(a), 90.629, 90.633, and 90.651(c) of the Commission's Rules to License Use of Six Conventional 900 MHZ Frequency Pairs for an Advanced Train Control System, Order, 3 F.C.C.R. 427, 428 (1988) (citing 47 U.S.C. 151, 332(a)(1) in support of waiver granted to facilitate development of an Advanced Train Control System which would "improve railroad safety ... dramatically"). Applying these principles, we think the waiver here