FCC Web Documents citing 74.761
- http://hraunfoss.fcc.gov/edocs_public/attachmatch/DOC-285869A1.doc http://hraunfoss.fcc.gov/edocs_public/attachmatch/DOC-285869A1.pdf
- power television station without prior authority of the Commission, including a change in authorized operating power. At the time of inspection, the Los Angeles agent observed that station K55KD, which is authorized by special temporary authority to operate at 5 kW effective radiated power (ERP) was operating at approximately 11.7 kW ERP, without obtaining prior Commission authority. 47 C.F.R. § 74.761(b): Frequency tolerance. ``The visual carrier shall be maintained to within 0.002 percent of the assigned visual carrier frequency for transmitters rated at more than 100 watts peak visual power.'' Station K55KD has an assigned visual carrier frequency of 729.250 MHz resulting in a frequency tolerance of 14.6 kHz. At the time of the inspection, the Los Angeles agent observed that
- http://hraunfoss.fcc.gov/edocs_public/attachmatch/FCC-01-123A1.doc http://hraunfoss.fcc.gov/edocs_public/attachmatch/FCC-01-123A1.pdf http://hraunfoss.fcc.gov/edocs_public/attachmatch/FCC-01-123A1.txt
- main studio at the site used by the station as of November 29, 1999. ***** Section 73.1545 is amended by revising paragraph (e) as follows and adding a related note. § 73.1545 Carrier frequency departure tolerances. ***** Class A TV Stations. The departure of the carrier frequency of Class A TV stations may not exceed the values specified in section 74.761 of this chapter. Provided, however, that Class A TV stations licensed to operate with a carrier offset, including those stations licensed with a maximum effective radiated power and/or antenna height greater than the values specified in their initial Class A TV station authorization, must comply with paragraph (c) of this section. Note: At a date not later than nine months
- http://hraunfoss.fcc.gov/edocs_public/attachmatch/FCC-02-40A1.doc http://hraunfoss.fcc.gov/edocs_public/attachmatch/FCC-02-40A1.pdf http://hraunfoss.fcc.gov/edocs_public/attachmatch/FCC-02-40A1.txt
- 47 C.F.R. § 1.3 (``Any provision of the rules may be waived by the Commission on its own motion or on petition if good cause therefor is shown.'') We will waive the following rules as inapplicable to the services provided under this pilot project: 47 C.F.R. § § 74.731(g)(permissible service), 74.732(g)(booster eligibility), 74.736(a)(emissions), 74.750(a)(FCC transmitter certification), 74.751(a)(modification of transmission systems), 74.761(frequency tolerance), and 74.763(c)(time of operation). Paragraph 19 of the Implementation Order, regarding facilities changes, will continue to apply. Applications to change channel or transmitter site location(s) must be filed in the normal manner on FCC Form 346, seeking a modified construction permit for the underlying analog facilities of the licensed LPTV station or a modification of such facilities in an
- http://transition.fcc.gov/Bureaus/Mass_Media/Orders/2000/fcc00115.doc http://transition.fcc.gov/Bureaus/Mass_Media/Orders/2000/fcc00115.pdf http://transition.fcc.gov/Bureaus/Mass_Media/Orders/2000/fcc00115.txt
- that they are maintained within the prescribed tolerances. * * * * * 21. Section 73.1545 is amended by adding paragraph (e) to read as follows: § 73.1545 Carrier frequency departure tolerances. * * * * * Class A TV stations. The departure of the carrier frequency of Class A TV stations may not exceed the values specified in section 74.761 of this chapter. Provided, however, Class A TV stations licensed to operate with a maximum effective radiated power greater than the value specified in their initial Class A TV station authorization must comply with paragraph (c) of this section. * * * * * 22. Section 73.1560 is amended to read as follows: § 73.1560 Operating power and mode tolerances.
- http://transition.fcc.gov/Bureaus/Mass_Media/Orders/2001/fcc01123.doc http://transition.fcc.gov/Bureaus/Mass_Media/Orders/2001/fcc01123.pdf http://transition.fcc.gov/Bureaus/Mass_Media/Orders/2001/fcc01123.txt
- main studio at the site used by the station as of November 29, 1999. ***** Section 73.1545 is amended by revising paragraph (e) as follows and adding a related note. § 73.1545 Carrier frequency departure tolerances. ***** Class A TV Stations. The departure of the carrier frequency of Class A TV stations may not exceed the values specified in section 74.761 of this chapter. Provided, however, that Class A TV stations licensed to operate with a carrier offset, including those stations licensed with a maximum effective radiated power and/or antenna height greater than the values specified in their initial Class A TV station authorization, must comply with paragraph (c) of this section. Note: At a date not later than nine months
- http://www.fcc.gov/Bureaus/Mass_Media/Orders/2000/fcc00115.doc http://www.fcc.gov/Bureaus/Mass_Media/Orders/2000/fcc00115.pdf http://www.fcc.gov/Bureaus/Mass_Media/Orders/2000/fcc00115.txt
- that they are maintained within the prescribed tolerances. * * * * * 21. Section 73.1545 is amended by adding paragraph (e) to read as follows: § 73.1545 Carrier frequency departure tolerances. * * * * * Class A TV stations. The departure of the carrier frequency of Class A TV stations may not exceed the values specified in section 74.761 of this chapter. Provided, however, Class A TV stations licensed to operate with a maximum effective radiated power greater than the value specified in their initial Class A TV station authorization must comply with paragraph (c) of this section. * * * * * 22. Section 73.1560 is amended to read as follows: § 73.1560 Operating power and mode tolerances.
- http://www.fcc.gov/Bureaus/Mass_Media/Orders/2001/fcc01123.doc http://www.fcc.gov/Bureaus/Mass_Media/Orders/2001/fcc01123.pdf http://www.fcc.gov/Bureaus/Mass_Media/Orders/2001/fcc01123.txt
- main studio at the site used by the station as of November 29, 1999. ***** Section 73.1545 is amended by revising paragraph (e) as follows and adding a related note. § 73.1545 Carrier frequency departure tolerances. ***** Class A TV Stations. The departure of the carrier frequency of Class A TV stations may not exceed the values specified in section 74.761 of this chapter. Provided, however, that Class A TV stations licensed to operate with a carrier offset, including those stations licensed with a maximum effective radiated power and/or antenna height greater than the values specified in their initial Class A TV station authorization, must comply with paragraph (c) of this section. Note: At a date not later than nine months
- http://www.fcc.gov/eb/FieldNotices/2003/DOC-285869A1.html
- television station without prior authority of the Commission, including a change in authorized operating power. At the time of inspection, the Los Angeles agent observed that station K55KD, which is authorized by special temporary authority to operate at 5 kW effective radiated power (ERP) was operating at approximately 11.7 kW ERP, without obtaining prior Commission authority. b. 47 C.F.R. S: 74.761(b): Frequency tolerance. "The visual carrier shall be maintained to within 0.002 percent of the assigned visual carrier frequency for transmitters rated at more than 100 watts peak visual power." Station K55KD has an assigned visual carrier frequency of 729.250 MHz resulting in a frequency tolerance of 14.6 kHz. At the time of the inspection, the Los Angeles agent observed that