a transmitted radio frequency carrier. The total peak frequency deviation will be determined by adding the deviation produced by the digital modulation signal and the deviation produced by any frequency division multiplex (FDM) modulation used. The deviation (D) produced by the FDM signal must be determined in accordance with § 2.202(f) of this chapter. * * * * * Section 74.536 is proposed to be amended by removing the line for 31.0 to 31.3 and footnotes 2 and 3 from the table in paragraph (c). Section 74.537 is proposed to be amended by revising paragraphs (b) and (c) to read as follows: § 74.537 Temporary authorizations. * * * * * (b) A request for special temporary authority for the operation
use under a station license except at stations licensed pursuant to an application filed before (insert date two years after publication in the Federal Register). Any non-conforming equipment authorized under a station license, and replaced on or after (insert date two years after publication in the Federal Register), must be replaced by conforming equipment. * * * * * Section 74.536 is amended by removing the line for 31.0 to 31.3 and footnotes 2 and 3 from the table in paragraph (c). Section 74.537 is amended by revising paragraphs (b) and (c) to read as follows: § 74.537 Temporary authorizations. * * * * * (b) A request for special temporary authority for the operation of an aural broadcast STL or