FCC Web Documents citing 74.503
- http://hraunfoss.fcc.gov/edocs_public/attachmatch/FCC-02-298A1.doc http://hraunfoss.fcc.gov/edocs_public/attachmatch/FCC-02-298A1.pdf http://hraunfoss.fcc.gov/edocs_public/attachmatch/FCC-02-298A1.txt
- and 17.7-19.7 GHz bands shared with FS operations, where the procedures set forth in Section 101.103(d), commonly referred to as ``prior coordination procedures,'' are required for both services prior to the filing of an application, and in the 12.7-13.25 GHz band, where an engineering study must be conducted prior to the filing of an application. See 47 C.F.R. §§ 74.502(c), 74.503(a), 74.604(a), 74.638, and 101.103(d). Local coordination procedures are not defined in the rules, but rather, Sections 74.503(a) and 74.604(a) place the responsibility for frequency selection to avoid interference on applicants, encouraging the use of local BAS coordinators or coordination committees where they exist, and no evidence of the accomplishment of frequency coordination is required to be submitted with the license