FCC Web Documents citing 27.1134
- http://fjallfoss.fcc.gov/edocs_public/attachmatch/FCC-04-218A1.doc http://fjallfoss.fcc.gov/edocs_public/attachmatch/FCC-04-218A1.pdf http://fjallfoss.fcc.gov/edocs_public/attachmatch/FCC-04-218A1.txt
- Relocation of fixed microwave service licensees in the 1915-1920 MHz band. 27.1113 Relocation of Broadcast Auxiliary Service, Cable Television Relay Service, and Local Television Transmission Service licensees in the 1995-2000 MHz and 2020-2025 MHz bands. Protection of Incumbent Operations 27.1131 Protection of Part 101 operations. 27.1132 Protection of Part 21 operations. 27.1133 Protection of Part 74 and Part 78 operations. 27.1134 Protection of Federal Government operations. 27.1135 Protection of non-Federal Government Meteorological-Satellite operations. 27.1136 Protection of Fixed Service stations operating in the 2160-2200 MHz band. Add new paragraphs (b)(9) and (b)(10) to § 27.1 to read as follows: § 27.1 Basis and purpose. * * * * * (b) * * * * * * * * (9) 1915-1920 MHz and
- http://hraunfoss.fcc.gov/edocs_public/attachmatch/DA-06-1612A1.doc http://hraunfoss.fcc.gov/edocs_public/attachmatch/DA-06-1612A1.pdf http://hraunfoss.fcc.gov/edocs_public/attachmatch/DA-06-1612A1.txt
- their area of operation, and coordinate proposed base and fixed stations with them before beginning operations. (See 47 C.F.R. § 27.1133.) AWS-1 licensees must protect Federal Government stations operating in the 1710-1755 and 1755-1761 MHz bands. They must also protect certain other Government stations operating in the 1675-1700 and 1675-1710 MHz bands if notified of interference. (See 47 C.F.R. § 27.1134.) AWS-1 licensees must protect non-Federal Government receivers operating in the 1675-1710 MHz Meteorological-Satellite Service if notified of interference. (See 47 C.F.R. § 27.1135.) AWS-1 licensees that construct or modify towers in the immediate vicinity of AM broadcast stations are responsible for correcting any disturbance in the AM station antenna pattern that causes operation outside the AM station's authorized radiation limits.
- http://hraunfoss.fcc.gov/edocs_public/attachmatch/FCC-03-251A1.doc http://hraunfoss.fcc.gov/edocs_public/attachmatch/FCC-03-251A1.pdf http://hraunfoss.fcc.gov/edocs_public/attachmatch/FCC-03-251A1.txt
- base and fixed stations at any locations that could potentially permit mobile, fixed, and portable stations transmitting in the 1710-1755 MHz band to cause interference to government systems operating within the radii of operation of the 16 facilities. Thus, AWS licensees shall be required to coordinate any operations that could permit mobile, fixed, and portable stations as specified in Section 27.1134(a) of the adopted rules. Except for Yuma, Arizona and Cherry Point, North Carolina, these various restrictions shall apply until such time as the relocation of the Federal systems has been completed. Furthermore, AWS licensees will be required to accept any interference received from operations at the 16 facilities. Such interference could occur at large distances outside the operating radii due
- http://hraunfoss.fcc.gov/edocs_public/attachmatch/FCC-04-218A1.doc http://hraunfoss.fcc.gov/edocs_public/attachmatch/FCC-04-218A1.pdf http://hraunfoss.fcc.gov/edocs_public/attachmatch/FCC-04-218A1.txt
- Relocation of fixed microwave service licensees in the 1915-1920 MHz band. 27.1113 Relocation of Broadcast Auxiliary Service, Cable Television Relay Service, and Local Television Transmission Service licensees in the 1995-2000 MHz and 2020-2025 MHz bands. Protection of Incumbent Operations 27.1131 Protection of Part 101 operations. 27.1132 Protection of Part 21 operations. 27.1133 Protection of Part 74 and Part 78 operations. 27.1134 Protection of Federal Government operations. 27.1135 Protection of non-Federal Government Meteorological-Satellite operations. 27.1136 Protection of Fixed Service stations operating in the 2160-2200 MHz band. Add new paragraphs (b)(9) and (b)(10) to § 27.1 to read as follows: § 27.1 Basis and purpose. * * * * * (b) * * * * * * * * (9) 1915-1920 MHz and
- http://hraunfoss.fcc.gov/edocs_public/attachmatch/FCC-06-47A1.doc http://hraunfoss.fcc.gov/edocs_public/attachmatch/FCC-06-47A1.pdf http://hraunfoss.fcc.gov/edocs_public/attachmatch/FCC-06-47A1.txt
- Communications Association International, Inc., IB Docket No. 02-364 (arguing that 2495-2500 MHz is not suitable relocation spectrum because spectrum must be shared with other services); Petition for Reconsideration filed by Globalstar Corporation, IB Docket No. 02-364 (arguing that BRS operations in the 2495-2500 MHz band should be limited to the top 35 metropolitan statistical areas). . See 47 C.F.R. § 27.1134(a). Specifically, AWS licensees must protect Government stations within the ``radii of operation'' of the 16 facilities. A table indicating the ``radius of operation'' for each of the 16 facilities is included in 47 C.F.R. § 27.1134(a). Operations will continue indefinitely and on a primary basis at the Cherry Point and Yuma facilities. 47 C.F.R. § 27.1134(a)(1). In addition, airborne and
- http://hraunfoss.fcc.gov/edocs_public/attachmatch/FCC-06-50A1.doc http://hraunfoss.fcc.gov/edocs_public/attachmatch/FCC-06-50A1.pdf http://hraunfoss.fcc.gov/edocs_public/attachmatch/FCC-06-50A1.txt
- Subpart L) (AWS Service Rules R&O). Pub. L. No. 108-494, 118 Stat. 3896, 3992 (2004). Title II of Pub. L. No. 108-494, 118 Stat. 3986, 3991 (2004) (codified at 47 U.S.C. § 928). 118 Stat. at 3992-93 (codified at 47 U.S.C. §§ 923(g)(4)(A), (C)). . 118 Stat. 3994 (codified at 47 U.S.C. § 309(j)(15)(c)). Id.; see also 47 C.F.R. § 27.1134 (Protection of Federal Government Operations). 47 U.S.C. § 923(b)(2)(C). 47 C.F.R. § 27.1134(a). 47 C.F.R. § 27.1134(b). Protection of non-DoD operations in the 1710-1755 MHz and 1755-1761 MHz bands. Until such time as non-DoD systems operating in the 1710-1755 MHz and 1755-1761 MHz bands are relocated to other spectrum, AWS licensees shall protect such systems by satisfying the appropriate provisions
- http://hraunfoss.fcc.gov/edocs_public/attachmatch/FCC-12-32A1.doc http://hraunfoss.fcc.gov/edocs_public/attachmatch/FCC-12-32A1.pdf http://hraunfoss.fcc.gov/edocs_public/attachmatch/FCC-12-32A1.txt
- a power greater than 1640 watts EIRP and greater than 1640 watts/MHz EIRP must be coordinated in advance with all AWS licensees authorized to operate on adjacent frequency blocks in the 2180-2200 MHz band. *****. Section 27.53 is amended by revising paragraph (h) introductory text to read as follows: § 27.53 Emission limits. ***** (h) Except as provided in section 27.1134(e) for the 2180-2200 MHz band, for operations in the 1710-1755 MHz, 2110-2155 MHz, 2000-2020 MHz, and 2180-2200 MHz bands, the power of any emission outside a licensee's frequency block shall be attenuated below the transmitter power (P) by at least 43 + 10 log10(P) dB. For operations in the 2000-2020 MHz band, the power of any emissions between 1995 MHz