FCC Web Documents citing 22.365
- http://wireless.fcc.gov/auctions/26/releases/pagebp_g.pdf
- technical requirements given in Table C-2 to § 22.361. (a) Maximum beamwidth is for the major lobe at the half power points. 33 (b) Suppression is the minimum attenuation for any secondary lobe referenced to the main lobe. (c) An omnidirectional antenna may be used for fixed transmitters where there are two or more receive locations at different azimuths. § 22.365 Antenna structures; air navigation safety. Licensees that own their antenna structures must not allow these antenna structures to become a hazard to air navigation. In general, antenna structure owners are responsible for registering antenna structures with the FCC if required by part 17 of this chapter, and for installing and maintaining any required marking and lighting. However, in the event
- http://www.fcc.gov/Bureaus/Wireless/Public_Notices/1998/da981687.pdf
- 22.323) should be eliminated. Specifically, requirements to: (1) not increase cost and charges of subscribers who do not use such services; (2) not degrade the primary public mobile C-l service offered; and (3) notify the Commission about such incidental service operations prior to providing them should all be eliminated. l Duplicative/redundant requirements concerning antenna structures and tower registration ($9 22.115(a)(3), 22.365) should be consolidated and clarified. These two sections repeat similar regulatory guidelines afd can easily be conformed into a single set of provisions that are more clear and understandable. Part 22 Pakw Remlations (8622.501 - 22.659)+A l Restrictions on permissible communications paths (0 22.5 15) should be modified. Currently, mobile stations are only permitted to communicate with and through base