Goto Section: 73.403 | 73.406 | Table of Contents
FCC 73.404
Revised as of September 1, 2021
Goto Year:2020 |
2022
§ 73.404 IBOC DAB operation.
(a) The licensee of an AM or FM station, or the permittee of a new AM
or FM station which has commenced program test operation pursuant to
§ 73.1620, may commence hybrid IBOC DAB operation with digital
facilities which conform to the technical specifications specified for
hybrid DAB operation in the (2002) First Report and Order in MM Docket
No. 99-325, as revised in the Media Bureau's subsequent Order in MM
Docket No. 99-325. In addition, the licensee of an AM station, or the
permittee of a new AM station that has commenced program test authority
pursuant to § 73.1620, may, with reasonable notice to listeners,
commence all-digital IBOC operation with digital facilities that
conform to the requirements set out in the (2020) Report and Order in
MB Docket No. 19-311 and MB Docket No. 13-249. An AM or FM station may
transmit IBOC signals during all hours for which the station is
licensed to broadcast.
(b) In situations where interference to other stations is anticipated
or actually occurs, hybrid AM licensees may, upon notification to the
Commission, reduce the power of the primary DAB sidebands by up to 6
dB. All-digital AM licensees, may, upon notification to the Commission,
reduce the power of the secondary and tertiary sidebands by up to 6 dB,
even if doing so results in non-compliance with § 73.1560(a)(1). Any
greater reduction of sideband power requires prior authority from the
Commission via the filing of a request for special temporary authority
or an informal letter request for modification of license.
(c) Hybrid IBOC AM stations must use the same licensed main or
auxiliary antenna to transmit the analog and digital signals.
(d) FM stations may transmit hybrid IBOC signals in combined mode;
i.e., using the same antenna for the analog and digital signals; or may
employ separate analog and digital antennas. Where separate antennas
are used, the digital antenna:
(1) Must be a licensed auxiliary antenna of the station;
(2) Must be located within 3 seconds latitude and longitude from the
analog antenna;
(3) Must have a radiation center height above average terrain between
70 and 100 percent of the height above average terrain of the analog
antenna.
[ 72 FR 45692 , Aug. 15, 2007, as amended at 75 FR 17877 , Apr. 8, 2010;
85 FR 18151 , Apr. 1, 2020; 85 FR 78027 , Dec. 3, 2020]
Goto Section: 73.403 | 73.406
Goto Year: 2020 |
2022
CiteFind - See documents on FCC website that
cite this rule
Want to support this service?
Thanks!
Report errors in
this rule. Since these rules are converted to HTML by machine, it's possible errors have been made. Please
help us improve these rules by clicking the Report FCC Rule Errors link to report an error.
hallikainen.com
Helping make public information public