Goto Section: 27.1178 | 27.1182 | Table of Contents
FCC 27.1180
Revised as of October 1, 2016
Goto Year:2015 |
2017
§ 27.1180 The cost-sharing formula.
(a) An AWS licensee that relocates a BRS system with which it
interferes is entitled to pro rata reimbursement based on the
cost-sharing formula specified in § 27.1164, except that the
depreciation factor shall be [180−Tm]/180, and the variable C shall be
applied as set forth in paragraph (b) of this section.
(b) C is the actual cost of relocating the system, and includes, but is
not limited to, such items as: Radio terminal equipment (TX and/or
RX—antenna, necessary feed lines, MUX/Modems); towers and/or
modifications; back-up power equipment; monitoring or control
equipment; engineering costs (design/path survey); installation;
systems testing; FCC filing costs; site acquisition and civil works;
zoning costs; training; disposal of old equipment; test equipment
(vendor required); spare equipment; project management; site lease
renegotiation; required antenna upgrades for interference control;
power plant upgrade (if required); electrical grounding systems;
Heating Ventilation and Air Conditioning (HVAC) (if required);
alternate transport equipment; leased facilities; and end user units
served by the base station that is being relocated. In addition to
actual costs, C may include the cost of an independent third party
appraisal conducted pursuant to § 27.1182(a)(3) and incumbent
transaction expenses that are directly attributable to the relocation,
subject to a cap of two percent of the “hard” costs involved. Hard
costs are defined as the actual costs associated with providing a
replacement system, such as equipment and engineering expenses. There
is no cap on the actual costs of relocation.
(c) An AWS system shall be considered an interfering system for
purposes of this rule if the AWS system is in all or part of the BRS
frequency band and operates within line of sight to BRS operations
under the applicable test specified in § 27.1184. An AWS relocator that
relocates a BRS system with which it does not interfere is entitled to
full reimbursement, as specified in § 27.1182(c).
return arrow Back to Top
Goto Section: 27.1178 | 27.1182
Goto Year: 2015 |
2017
CiteFind - See documents on FCC website that
cite this rule
Want to support this service?
Thanks!
Report errors in
this rule. Since these rules are converted to HTML by machine, it's possible errors have been made. Please
help us improve these rules by clicking the Report FCC Rule Errors link to report an error.
hallikainen.com
Helping make public information public