Goto Section: 90.249 | 90.251 | Table of Contents

FCC 90.250
Revised as of October 2, 2015
Goto Year:2014 | 2016
  § 90.250   Meteor burst communications.

   Meteor burst communications may be authorized for the use of private radio
   stations subject to the following provisions:

   (a) Station operation is limited to the State of Alaska only.

   (b) The frequency 44.20 MHz may be used for base station operation and 45.90
   MHz for remote station operation on a primary basis. The frequencies 42.40
   and 44.10 MHz may be used by base and remote stations, respectively, on a
   secondary  basis  to  common  carrier  stations utilizing meteor burst
   communications.  Users  shall cooperate among themselves to the extent
   practicable to promote compatible operation.

   (c) The maximum transmitter output power shall not exceed 2000 watts for
   base stations and 500 watts for remote stations.

   (d) Co-channel base stations of different licensees shall be located at
   least 241 km (150 miles) apart. A remote station and a base station of
   different licensees shall be located at least 241 km (150 miles) apart if
   the remote units of the different licensees operate on the same frequency.
   Waiver of this requirement may be granted if affected users agree to a
   cooperative sharing arrangement.

   (e) The authorized emission designator to be used in F1E, F7W, G1E or G7W to
   allow for Phase Shift Keying (PSK) or Frequency Shift Keying (FSK).

   (f) The maximum authorized bandwidth is 20 kHz.

   (g) Station identification in accordance with § 90.425(a) or (b) shall only
   be required for the base station.

   (h)  Stations  may be required to comply with additional conditions of
   operation  as  necessary  on  a case-by-case basis as specified in the
   authorization.

   (i)  Stations  employing  meteor  burst  communications must not cause
   interference to other stations operating in accordance with the allocation
   table.  New  authorizations will be issued subject to the Commission's
   experimental licensing rules in part 5 of this chapter. Prior to expiration
   of the experimental authorization, application Form 601 should be filed for
   issuance of a permanent authorization.

   [ 48 FR 34043 , July 27, 1983, as amended at  49 FR 48712 , Dec. 14, 1984;  58 FR 44957 , Aug. 25, 1993;  72 FR 35196 , June 27, 2007;  78 FR 25175 , Apr. 29,
   2013]

   return arrow Back to Top

Subpart K—Standards for Special Frequencies or Frequency Bands

   return arrow Back to Top


Goto Section: 90.249 | 90.251

Goto Year: 2014 | 2016
CiteFind - See documents on FCC website that cite this rule

Want to support this service?
Thanks!

Report errors in this rule. Since these rules are converted to HTML by machine, it's possible errors have been made. Please help us improve these rules by clicking the Report FCC Rule Errors link to report an error.
hallikainen.com
Helping make public information public