Goto Section: 101.815 | 101.819 | Table of Contents
FCC 101.817
Revised as of October 2, 2015
Goto Year:2014 |
2016
§ 101.817 Notification of station operation at temporary locations.
(a) The licensee of stations authorized pursuant to § 101.813 must notify the
Commission prior to each period of operation. This notification must
include:
(1) The call sign, manufacturer's name, type or model number, output power
and specific location of the transmitter(s);
(2) The maintenance location for the transmitter;
(3) The location of the transmitting or receiving station with which it will
communicate and the identity of the correspondent operating such facilities;
(4) The exact frequency or frequencies to be used;
(5) The public interest, convenience and necessity to be served by operation
of the proposed installation;
(6) The commencement and anticipated termination dates of operation from
each location. In the event the actual termination date differs from the
previous notification, written notice thereof promptly must be given to the
Commission;
(7) Where the notification contemplates initially a service that is to be
rendered for a period longer than 90 days, the notification must contain a
showing as to why application should not be made for regular authorization;
and
(8) A notification must include compliance with the provisions of
§ 101.813(c).
(b) A copy of the notification must be kept with the station license.
[ 61 FR 26677 , May 28, 1996, as amended at 63 FR 68984 Dec. 14, 1998]
return arrow Back to Top
Goto Section: 101.815 | 101.819
Goto Year: 2014 |
2016
CiteFind - See documents on FCC website that
cite this rule
Want to support this service?
Thanks!
Report errors in
this rule. Since these rules are converted to HTML by machine, it's possible errors have been made. Please
help us improve these rules by clicking the Report FCC Rule Errors link to report an error.
hallikainen.com
Helping make public information public