  §  22.929   Application requirements for the Cellular Radiotelephone Service.

   In addition to information required by subparts B and D of this part,
   applications for authorization in the Cellular Radiotelephone Service
   contain required information as described in the instructions to the
   form. Site coordinates must be referenced to NAD83 and be correct to
   +-1 second.

   (a) Administrative information . The following information is required
   either by FCC Form 601, or as an exhibit:

   (1) Location description; city; county; state; geographical coordinates
   correct to +-1 second, the datum used (NAD 83), site elevation above
   mean sea level, proximity to adjacent market boundaries and
   international borders;

   (2) Antenna height to tip above ground level, the height of the center
   of radiation of the antenna above the average terrain, the height of
   the antenna center of radiation above the average elevation of the
   terrain along each of the 8 cardinal radials, antenna gain in the
   maximum lobe, the beamwidth of the maximum lobe of the antenna, a polar
   plot of the horizontal gain pattern of the antenna, the electric field
   polarization of the wave emitted by the antenna when installed as
   proposed:

   (3) The channel block requested, the maximum effective radiated power,
   the effective radiated power in each of the cardinal radial directions.

   (b) If the application involves a service area boundary (SAB) extension
   (§ 22.912 of this chapter), the licensee must provide a statement as
   described in § 22.953.

   (c) Maps . If the application proposes a change in the CGSA, it must
   include full size and reduced maps, and supporting engineering, as
   described in § 22.953 (a)(1) through (a)(3).

   (d) Antenna Information. Upon request by an applicant, licensee, or the
   Commission, a cellular applicant or licensee of whom the request is
   made shall furnish the antenna type, model, and the name of the antenna
   manufacturer to the requesting party within ten (10) days of receiving
   written notification.

   [ 63 FR 68951 , Dec. 14, 1998, as amended at  64 FR 53241 , Oct. 1, 1999]


Goto Section: 22.927 | 22.935

Goto Year: 2010 | 2012
CiteFind - See documents on FCC website that cite this rule

Want to support this service?
Thanks!

Report errors in this rule. Since these rules are converted to HTML by machine, it's possible errors have been made. Please help us improve these rules by clicking the Report FCC Rule Errors link to report an error.
hallikainen.com
Helping make public information public