Goto Section: 25.139 | 25.142 | Table of Contents
FCC 25.140
Revised as of October 1, 2010
Goto Year:2009 |
2011
§ 25.140 Qualifications of fixed-satellite space station licensees.
(a) New fixed-satellites shall comply with the requirements established
in Report and Order, CC Docket No. 81-704 (available at address in
§ 0.445 of this chapter.) Applications must also meet the requirements
in paragraphs (b) through (d) of this section. The Commission may
require additional or different information in the case of any
individual application. Applications will be unacceptable for filing
and will be returned to the applicant if they do not meet the
requirements referred to in this paragraph.
(b) Each applicant for a space station authorization in the
fixed-satellite service must demonstrate, on the basis of the
documentation contained in its application, that it is legally,
technically, and otherwise qualified to proceed expeditiously with the
construction, launch and/or operation of each proposed space station
facility immediately upon grant of the requested authorization. Each
applicant must provide the following information:
(1) The information specified in § 25.114; and
(2) Except as set forth in paragraphs (b)(3), (b)(4), (b)(5), and
(b)(6) of this section, all applicants must provide an interference
analysis to demonstrate the compatibility of their proposed system two
degrees from any authorized space station. An applicant should provide
details of its proposed r.f. carriers which it believes should be taken
into account in this analysis. At a minimum, the applicant must
include, for each type of r.f. carrier, the link noise budget,
modulation parameters, and overall link performance analysis. ( See,
e.g. , appendices B and C to Licensing of Space Stations in the
Domestic Fixed-Satellite Service (available at address in Sec. 0.445)).
(3) Except as described in paragraph (b)(5) of this section, an
applicant for a license to operate a 17/24 GHz BSS space station that
will be located precisely at one of the 17/24 GHz BSS orbital locations
specified in Appendix F of the Report and Order adopted May 2, 2007, IB
Docket No. 06-123, FCC 07-76, must provide an interference analysis of
the kind described in paragraph (b)(2) of this section, except that the
applicant must demonstrate the compatibility of its proposed network
with any current or future authorized space station in the 17/24 GHz
BSS that complies with the technical rules in this part and that will
be located at least four degrees from the proposed space station.
(4) Except as described in paragraph (b)(5) of this section, an
applicant for a license to operate a 17/24 GHz BSS space station that
will not be located precisely at one of the nominal 17/24 GHz BSS
orbital locations specified in Appendix F of the Report and Order
adopted May 2, 2007, IB Docket No. 06-123, FCC 07-76, must make one of
the following showings:
(i) In cases where there is no previously licensed or proposed space
station to be located closer than four degrees from the applicant's
space station, and the applicant seeks to operate pursuant to
§ 25.262(b) of this part, the applicant must provide an interference
analysis of the kind described in paragraph (b)(2) of this section,
except that the applicant must demonstrate the compatibility of its
proposed network with any current or future authorized space stations
in the 17/24 GHz BSS that are operating in compliance with the
technical rules of this part and that will be located at least four
degrees from the applicant's proposed space station;
(ii) In cases where there is a previously licensed or proposed 17/24
GHz BSS space station to be located within four degrees of the
applicant's proposed space station, the applicant must provide an
interference analysis of the kind described in paragraph (b)(2) of this
section, except that the applicant must demonstrate that its proposed
network will not cause more interference to the adjacent 17/24 GHz BSS
satellite networks operating in compliance with the technical
requirements of this part, than if the applicant were located at the
precise Appendix F orbital location from which it seeks to offset;
(iii) In cases where there is no previously licensed or proposed 17/24
GHz BSS space station to be located within four degrees of the
applicant's proposed space station, and the applicant does not seek to
operate pursuant to § 25.262(b) of this part, the applicant must
provide an interference analysis of the kind described in paragraph
(b)(2) of this section, except that the applicant must demonstrate that
its proposed operations will not cause more interference to any current
or future 17/24 GHz BSS satellite networks operating in compliance with
the technical requirements of this part, than if the applicant were
located at the precise Appendix F orbital location from which it seeks
to offset.
(5) An applicant for a license to operate a 17/24 GHz BSS space
station, in cases where there is a previously licensed or proposed
space station operating pursuant to § 25.262(b) of this part located
within four degrees of the applicant's proposed 17/24 GHz BSS space
station, must provide an interference analysis of the kind described in
paragraph (b)(2) of this section, except that the applicant must
demonstrate that its proposed operations will not cause more
interference to the adjacent 17/24 GHz BSS satellite network than if
the adjacent space station were located four degrees from the
applicant's space station.
(6) In addition to the requirements of paragraphs (b)(3), (b)(4), and
(b)(5) of this section, the link budget for any satellite in the 17/24
GHz BSS must take into account longitudinal stationkeeping tolerances
and, where appropriate, any existing orbital location offsets from the
17/24 GHz BSS orbital locations of the adjacent prior-authorized 17/24
GHz BSS space stations. In addition, any 17/24 GHz BSS satellite
applicant that has reached a coordination agreement with an operator of
another 17/24 GHz BSS satellite to allow that operator to exceed the
pfd levels specified in the rules for this service, must use those
higher pfd levels for the purposes of this showing.
(c) Operators of satellite networks using 17/24 GHz BSS space stations
must design their satellite networks to be capable of operating with
another 17/24 GHz BSS space station as follows:
(1) Except as described in paragraphs (b)(4)(ii) and (b)(4)(iii) of
this section, all satellite network operators using 17/24 GHz BSS space
stations must design their satellite networks to be capable of
operating with another 17/24 GHz BSS space station as close as four
degrees away.
(2) Satellite network operators located less than four degrees away
from a space station to be operated pursuant to § 25.262(b) of this
part must design their satellite networks to be capable of operating
with that adjacent 17/24 GHz BSS space station.
(3) Satellite network operators using 17/24 GHz BSS space stations
located at an orbital location other than those specified in Appendix F
of the Report and Order adopted May 2, 2007, IB Docket No. 06-123, FCC
07-76, and that are not operating pursuant to § 25.262(b) of this part,
must design their satellite networks to be capable of operating with
another 17/24 GHz BSS space station closer than four degrees away, as a
result of the operator's offset position.
(d)-(g) [Reserved]
[ 62 FR 5929 , Feb. 10, 1997, as amended at 68 FR 51504 , Aug. 27, 2003;
72 FR 50028 , Aug. 29, 2007; 72 FR 60279 , Oct. 24, 2007]
Goto Section: 25.139 | 25.142
Goto Year: 2009 |
2011
CiteFind - See documents on FCC website that
cite this rule
Want to support this service?
Thanks!
Report errors in
this rule. Since these rules are converted to HTML by machine, it's possible errors have been made. Please
help us improve these rules by clicking the Report FCC Rule Errors link to report an error.
hallikainen.com
Helping make public information public