Goto Section: 90.311 | 90.315 | Table of Contents
FCC 90.313
Revised as of October 1, 2007
Goto Year:2006 |
2008
Sec. 90.313 Frequency loading criteria.
(a) Except as provided for in paragraph (b) of this section, the maximum
channel loading on frequencies in the 470–512 MHz band is as follows:
(1) 50 units for systems eligible in the Public Safety Pool (see Sec. 90.20(a)).
(2) 90 units for systems eligible in the Industrial/Business Pool (see
Sec. 90.35(a)).
(b) If a licensee has exclusive use of a frequency, then the loading
standards in paragraph (a) of this section, may be exceeded. If it is a
shared channel, the loading standards can be exceeded upon submission of a
signed statement by all those sharing the channel agreeing to the increase.
(c) A unit is defined as a mobile transmitter-receiver. Loading standards
will be applied in terms of the number of units actually in use or to be
placed in use within 8 months following authorization. A licensee will be
required to show that an assigned frequency pair is at full capacity before
it may be assigned a second or additional frequency pair. Channel capacity
may be reached either by the requirements of a single licensee or by several
users sharing a channel. Until a channel is loaded to capacity it will be
available for assignment to other users in the same area. A frequency pair
may be reassigned at distances 64 km. (40 mi.), 32 km. (20 mi.) for Channel
15, Chicago; Channel 20, Philadelphia; and Channel 17, Washington, or more
from the location of base stations authorized on that pair without reference
to loading at the point of original installation. Following authorization,
the licensee shall notify the Commission either during or at the close of
the 8 month period of the number of units in operation. In the Industrial
Radio Services, if the base station facility is to be used by more than a
single licensee, the frequency assigned to it will not be reassigned for use
by another facility within 64 km. (40 mi.) or 32 km. (20 mi.) where
applicable for a period of 12 months, Provided, That the facility is
constructed within 90 days from the date of the first grant, meets the
loading standards to at least 50 percent within 9 months, and meets all
loading standards within 12 months.
[ 43 FR 54791 , Nov. 22, 1978, as amended at 47 FR 36649 , Aug. 23, 1982; 62 FR 18933 , Apr. 17, 1997]
Goto Section: 90.311 | 90.315
Goto Year: 2006 |
2008
CiteFind - See documents on FCC website that
cite this rule
Want to support this service?
Thanks!
Report errors in
this rule. Since these rules are converted to HTML by machine, it's possible errors have been made. Please
help us improve these rules by clicking the Report FCC Rule Errors link to report an error.
hallikainen.com
Helping make public information public