FCC 5.89 Revised as of October 1, 2007
Goto Year:2006 |
2008
Sec. 5.89 School and student authorizations.
The Commission may issue an authorization to schools or students for the
purpose of presenting experiments or technical demonstrations for school or
school approved projects that require the use of radio for a limited period
of time. Such authorizations may be granted at the discretion of the
Commission.
(a) An application for a school or student authorization may be filed in
letter form and must comply with the provisions of Sec. 5.63, of this part
except where specified below. The application must be accompanied by a
signed statement from a member of faculty of the school, on appropriate
letterhead, indicating the person under whose general supervision the
project will be conducted. In the case of student authorizations, the letter
must state that the project has the approval of the school.
(b) Frequencies in the following bands are available for assignment in
authorizations issued under this section:
27.23–27.28 MHz.
460–461 MHz.
462.525–467.475 MHz.
2402–2483.5 MHz.
10.00–10.50 GHz.
(c) Operations under this section are limited to 4 watts equivalent
isotropically radiated power (EIRP). The Commission may authorize a greater
power if a satisfactory showing is made that such greater power is necessary
and that appropriate measures will be taken to prevent interference.
(d) The frequency of operation must be measured or checked prior to each
time of operation.
(e) Subject to the provisions of (b), (c) and (d), the provisions in subpart
C of this part are waived insofar as such provisions require a station
authorized under this section to observe the technical and operating
restrictions set forth therein.
(f) The licensee holding an authorization issued under this section shall
maintain a record of operation containing the following information:
(1) A brief description of the experimentation being conducted.
(2) The date and time of each period of operation.
(3) The frequency of operation as measured or checked at the beginning of
each period of operation.
(g) The record of operation shall be retained for one month after the
termination of the authorization.
[ 63 FR 64202 , Nov. 19, 1998; 64 FR 43095 , Aug. 9, 1999]
CiteFind - See documents on FCC website that
cite this rule
Want to support this service?
Thanks!
Report errors in
this rule. Since these rules are converted to HTML by machine, it's possible errors have been made. Please
help us improve these rules by clicking the Report FCC Rule Errors link to report an error.