Goto Section: 25.261 | 25.271 | Table of Contents

FCC 25.262
Revised as of October 1, 2007
Goto Year:2006 | 2008
Sec.  25.262   Space station coordination requirements in the 17/24 GHz BSS.

   (a) Any space station licensee operating a space station in the 17/24 GHz
   BSS, and required to provide information in its application pursuant to
    Sec. 25.114(d)(15)(ii) of this part, shall bear the burden of coordinating with
   any  future  co-frequency  applicants or licensees under the following
   circumstances:

   (1) If the licensee's operations exceed the power flux-density limits set
   forth in  Sec. 25.208(w) of this part by 3 dB or less, the licensee shall bear
   the burden of coordinating with any future applicants or licensees proposing
   a  satellite in compliance with power flux-density limits set forth in
    Sec. 25.208(w) of this part and located within  ± 6 degrees of the licensee's
   satellite.

   (2) If the licensee's operations exceed the power flux-density limits set
   forth in  Sec. 25.208(w) of this part by more than 3 dB, the licensee shall bear
   the burden of coordinating with any future applicants or licensees proposing
   a  satellite in compliance with power flux-density limits set forth in
    Sec. 25.208(w) of this part and located within  ± 10 degrees of the licensee's
   satellite.

   (3) If no good faith agreement can be reached, the operator of the 17/24 GHz
   satellite that does not comply with  Sec. 25.208(w) of this part shall reduce its
   space station power flux-density levels to be compliant with those specified
   in  Sec. 25.208(w) of this part.

   (b) Any space station licensee operating a space station in the 17/24 GHz
   BSS, and required to provide information in its application pursuant to
    Sec. 25.114(d)(15)(iii) of this part, must accept any increased interference
   that  may  result  from adjacent 17/24 GHz BSS space stations that are
   operating in compliance with the rules for this service.

   [ 72 FR 50033 , Aug. 29, 2007]

Subpart D—Technical Operations

   Source:    58 FR 13421 , Mar. 11, 1993, unless otherwise noted.


Goto Section: 25.261 | 25.271

Goto Year: 2006 | 2008
CiteFind - See documents on FCC website that cite this rule

Want to support this service?
Thanks!

Report errors in this rule. Since these rules are converted to HTML by machine, it's possible errors have been made. Please help us improve these rules by clicking the Report FCC Rule Errors link to report an error.
hallikainen.com
Helping make public information public